Creating / Running a CFR Application (Microsoft Access)
SECTION 13 CFR (Title 21
203
3. Add a left click script to the Increment Point button….
iAudit = 1
rAuditArray(0) = rAuditArray(0) + 0.5
rAuditArray(1) = rAuditArray(1) + 1.0
rAuditArray(2) = rAuditArray(2) + 2.5
4. Add left click scripts to Login Designer and Logout to the buttons shown.
5. Add left click scripts to the Start and Stop Audit trail buttons….
StartAuditTrail()
and
StopAuditTrail|()
.
NOTE: The new scripting functions for StartAuditTrail() and StopAuditTrail()
can be found in the script editor menu under…
Special\Datalogging
.
13-4-2 Configuring Points for Audit
The advanced settings dialog for the point contains a check box…’Generate
Audit Trail’. Check this box for each point to be audited. For the test project
apply the setting for the points
iAudit
and
rAuditArray
:
IMPORTANT NOTE:
The use of CX-Supervisor I/O points is not recommended for audit trail logging
since unexpected or spurious results can be observed due to the
asynchronous input and output nature of these points.
13-4-3
Default Audit Trail Configuration
The Audit Trail Configuration dialog is launched from the developer menu
under ‘Project\Runtime Settings\Audit Trail Settings’. The screen shot below
shows the configuration dialog in its default state. The basic features defined
by the default state are:
•
The default connection is to an Access database file (*.mdb).
•
Point Auditing is always enabled.
•
By default, when no destination folder is specified, an ‘Audit Trail’ folder
will be created under the project folder.
Содержание CX-Supervisor
Страница 1: ...CX Supervisor Software Cat No W10E EN 01 User Manual Software Release 3 1...
Страница 3: ...Copyright Notice 2...
Страница 16: ...15...
Страница 17: ...16...
Страница 27: ...Tip of the Day SECTION 1 Graphics Editor 26...
Страница 35: ...CX Supervisor Preferences SECTION 2 Pages 34...
Страница 79: ...Responding to Events SECTION 5 ActiveX Objects 78...
Страница 115: ...Printing the Graphics Library SECTION 7 Graphics Library 114...
Страница 181: ...Data Logging SECTION 11 Data Logging 180...
Страница 201: ...Examples SECTION 12 Databases 200...
Страница 243: ...Performance Monitor SECTION 16 Application Analysis Performance Monitor 242...
Страница 253: ...Using with Omron s CX Server OPC SECTION 17 Using CX Supervisor as an OPC Cli 252...
Страница 259: ...Creating a CX Supervisor Client application SECTION 18 Connecting to a remote CX 258...
Страница 263: ...Adding a Point Linked to a Parameter SECTION 19 Connecting to Omron Industrial 262...
Страница 271: ...Data Logging SECTION 20 Best Practices 270...
Страница 275: ...Configuring a Server PC running Windows NT or 2000 Appendix A Configuring a PC 274...
Страница 277: ...Appendix B Frequently Asked Questions 276...
Страница 296: ...Appendix B Frequently Asked Questions 295...
Страница 297: ...Appendix B Frequently Asked Questions 296...
Страница 298: ...Appendix B Frequently Asked Questions 297...
Страница 299: ...Appendix B Frequently Asked Questions 298...
Страница 333: ...Revision history 332...