75
[Step 5]
Set the zone (Parameters No.1 and 2) and soft limit (Parameter No.3 and 4) that suit
to the system.
[Step 6]
Write the edited parameters to MCON. Writing is to be conducted in unit of the drive
units (two axes unit).
Once “Transfer” button is pressed, the confirmation message window appears. Click
on “Yes” button.
[Step 7]
A confirmation window for Gateway Unit reboot opens. Click “Yes” button to accept
the reboot. Rebooting is also to be conducted in unit of the driving units (two axes
unit).
[Step 8]
Reboot all
(Note 1)
the axes and the setup is complete.
Note 1 It is not necessary to have a transfer and reboot o the drive units with no
parameter change made.
3.2 Initial Setting
Содержание MCON-C
Страница 1: ...MCON C CG Controller Instruction Manual Fourth Edition ...
Страница 2: ......
Страница 22: ...12 International Standards Compliances MCON with the following overseas standard RoHS Directive CE Marking UL ...
Страница 48: ...38 Chapter 1 Specifications Check ...
Страница 264: ...254 Note 1 blinking Note 2 single flash Note 3 double flash Timing of LED flashing 3 10 Fieldbus Status LEDs ...
Страница 268: ...258 3 10 Fieldbus Status LEDs ...
Страница 274: ...264 Chapter 4 Vibration Suppress Control Function ...
Страница 278: ...268 Chapter 5 Collision Detection Feature ...
Страница 284: ...274 Chapter 6 Power saving Function ...
Страница 292: ...282 Chapter 7 Absolute Reset and Absolute Battery ...
Страница 358: ...348 Chapter 9 Troubleshooting ...
Страница 368: ...358 4 TP adapter and accessories 1 TP adapter external dimensions RCB LB TGS Chapter 10 Appendix ...
Страница 474: ...Chapter 10 Appendix 464 ...
Страница 478: ......
Страница 479: ......