GE M
EDICAL
S
YSTEMS
D
IRECTION
FC091194, R
EVISION
02
V
IVID
7 / V
IVID
7 PRO S
ERVICE
M
ANUAL
Chapter 10 - Periodic Maintenance
10 - 13
10-7-4-1
Meter Procedure
Follow these steps to test the ground wire resistance.
1.) Turn the Vivid 7 / Vivid 7 PRO unit OFF.
2.) Plug the unit into the meter, and the meter into the tested AC wall outlet.
3.) Plug the black chassis cable into the meter's “CHASSIS” connector and attach the black chassis
cable clamp to an exposed metal part of the Vivid 7 / Vivid 7 PRO unit.
4.) Set the meter's “FUNCTION” switch to the RESISTANCE position.
5.) Set the meter's “POLARITY” switch to the OFF (center) position.
6.) Measure and record the ground wire resistance.
Содержание FC091194
Страница 2: ......
Страница 508: ...GE MEDICAL SYSTEMS DIRECTION FC091194 REVISION 02 VIVID 7 VIVID 7 PRO SERVICE MANUAL Index 6 Index ...
Страница 509: ......