GE M
EDICAL
S
YSTEMS
D
IRECTION
FC091194, R
EVISION
02
V
IVID
7 / V
IVID
7 PRO S
ERVICE
M
ANUAL
3 - 20
Section 3-6 - Preparing for Installation
3-7-12-3 Full Power Shut Down (cont’d)
2.) Click SHUTDOWN to do a complete power down of the unit.
Backend Processor will first turn OFF the Scanner activity and print the message “Please wait -
Shutdown in progress” in the LCD display. Then it starts to shut down itself. The time to turn down
the Scanner including the Backend Processor, may vary from 10 seconds up to approximately 1
minute. The last thing that shut down, is the light in the LCD displays, indicating that you can
continue to the next step.
3.) Switch OFF the
CIRCUIT BREAKER
(located on the rear of the unit)
This will cut power distribution within the unit.
If the Backend Processor is still running, the internal Un-interupted Power Supply (UPS) will switch
over to battery power and supply the Backend Processor with power until it has shut down properly.
A periodic high-pitch sound alarm indicates that the Backend Processor is running on battery
power.
.
Figure 3-15 Circuit Breaker located on rear of the unit
Circuit Breaker
Содержание FC091194
Страница 2: ......
Страница 508: ...GE MEDICAL SYSTEMS DIRECTION FC091194 REVISION 02 VIVID 7 VIVID 7 PRO SERVICE MANUAL Index 6 Index ...
Страница 509: ......