GE M
EDICAL
S
YSTEMS
D
IRECTION
FC091194, R
EVISION
02
V
IVID
7 / V
IVID
7 PRO S
ERVICE
M
ANUAL
3 - 14
Section 3-6 - Preparing for Installation
3-7-10
Power ON/Boot Up
3-7-10-1
Connecting Mains Power to the Unit
NOTE:
Do not cycle the Circuit Breaker ON-OFF-ON in less than five -5- seconds. When turning OFF
the Circuit Breaker, the system should de-energize completely before turning the circuit breaker
ON.
NOTE:
When turning on a system from standby mode, it takes a few seconds before it responds. Do not push
the On/off button again during this period. A second push will initiate a full shutdown.
DANGER
Never use a three-to-two prong adapter; this defeats the safety ground.
CAUTION
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The covers
are required for safe operation, good system performance and cooling purposes.
Table 3-8
Connecting Mains Power to the unit
Step
Task
Expected Result(s)
1
Connect the female plug on the Power Cable to the Power Inlet
at the rear of the unit.
.
2
Lock the plug in position with the retaining clasp.
The retaining clasp prevent the plug from being unplugged during use.
3
Verify that the Mains Power Circuit Breaker is in OFF position,
eventually switch it OFF.
.
4
Connect the other end of the Power Cable (with the male plug)
to a hospital grade mains power outlet with the proper rated
voltage.
The unit is ready for Power ON/Boot Up.
Clasp OFF
Clasp ON
OFF Position
Содержание FC091194
Страница 2: ......
Страница 508: ...GE MEDICAL SYSTEMS DIRECTION FC091194 REVISION 02 VIVID 7 VIVID 7 PRO SERVICE MANUAL Index 6 Index ...
Страница 509: ......