GE M
EDICAL
S
YSTEMS
D
IRECTION
FC091194, R
EVISION
02
V
IVID
7 / V
IVID
7 PRO S
ERVICE
M
ANUAL
Index
Index - 1
A
AC Power
Replacement Procedure, 8-34
AC Transformer
Replacement Procedure, 8-31
Acoustic Noise Output, 3-8
AE Title, 3-50
Air Filter Cleaning, 10-8
Application Turnover Check List, 4-63
Archiving and Loading Presets, 4-12
Archiving Presets to an MO Disk, 4-12
Audio
Doppler, 5-7
Available Probes, 3-32
Average Installation Time, 3-1
B
Back End Processor, 5-14, , 5-74
Theory, 5-14
Back Plane (Motherboard), 5-92
Battery (UPS) Operation, 5-19
Beamformer Board(s), BF-64, 5-53
Beamformer Calibration, 7-60
Beamformer Calibration -- see DC Offset Calibration, 7-29
Brake Pedal
Replacement Procedure, 8-51
Brake Pedal and Direction Lock Assembly
Replacement Procedures, 8-53
Brakes Check, 4-62
Bumpers and Covers
- Overview, 8-2
C
Certified Electrical Contractor Statement, -vi
Chain
Signal Chain, TX/RLB/RX/BF Test, 7-64
Chassis Leakage Current Test, 10-14
Check the Connection to the DICOM Server, 3-53
Circuit Boards, 5-44
Cleaning, 10-7
Color Flow
Processing, 5-6
Color Inkjet Printer, 3-32
Color Mode
Overview, 4-34
Common Diagnostics, 7-44
Common Service Interface, 5-101
Completing the Installation, 3-8
Components and Functions, 5-1
Configuration, 3-21
Connecting Laptop Computer to the Ultrasound Unit, 7-4
Connectivity, 3-35
Setup, 3-37
Console
Environmental Requirements, 2-2
Mechanical Checks, 4-61
Contact Information, 1-38
Conventions
Conventions Used in Book, 1-8
Cooling, 2-2
Covers and Bumpers
- Overview, 8-2
Customer Assistance, 1-38
D
Damage in Transportation, -v
Dangerous Procedure Warnings, 1-36
Data
Buffer, 5-6
from Mid Processors, 5-8
from VCR, 5-8
Data Sheet for
- Chassis Source Leakage Current, 10-16
- ECG Leakage Current, 10-19
- Transducer Source Leakage Current, 10-22
Date and Time Adjustments, 3-25
DC Offset calibration, 7-29
DC Power, 5-37
Replacement Procedure, 8-36
Default DICOM Setup in Configuration Screen, 3-52
Department Name, 3-24
Depth, 3-8
Diagnostics/Troubleshooting, 7-1
DICOM, 3-49
DICOM Option Pre-Installation Requirements, 2-10
DICOM Server’s Set Up, 3-49
Digital Signal Processor
DSP, 5-7
Direction Lock
Check, 4-62
Pedal Replacement Procedure, 8-52
Disconnect Probe, 3-13
Display Platform Mechanical Checks, 4-61
Doppler
Doppler Processing, 5-6
DSP
Digital Signal Processor, 5-7
INDEX
Содержание FC091194
Страница 2: ......
Страница 508: ...GE MEDICAL SYSTEMS DIRECTION FC091194 REVISION 02 VIVID 7 VIVID 7 PRO SERVICE MANUAL Index 6 Index ...
Страница 509: ......