![TOHATSU BFT 250A Service Manual Download Page 544](http://html1.mh-extra.com/html/tohatsu/bft-250a/bft-250a_service-manual_1124640544.webp)
17-40
dummyhead
dummyhead
GEAR CASE (COUNTER ROTATION)
BACKLASH INSPECTION
FORWARD BEVEL GEAR BACKLASH
Backlash adjustment must be made after adjustment of
each gear shim (page 17-34).
Install the following parts except the water pump.
– Vertical shaft/forward bevel gear (page 17-28)
– Propeller shaft holder (page 17-17)
– Shift rod (page 17-15)
Wrap a shop towel [1] around the shift rod spline [2],
and use pliers to turn the shift rod in the direction shown
(cutout of the shift rod spline [3] is toward the right side
of the cruising direction [4]).
Set the special tools as shown.
• Adjust the dial indicator [2] so its needle is at the line
of the indicator clip [3].
• Align the backlash indicator tool with line of the base
plate [4]
Turn the vertical shaft lightly right and left and record
the dial indicator reading.
Measure the backlash at six lines of the base plate.
Turn the vertical shaft 180° and measure the backlash
in the same manner.
When measuring the backlash, do not turn the propeller
shaft by turning the vertical shaft.
Obtain the forward bevel gear backlash using the dial
gauge runout and the following formula.
Formula:
Backlash = Dial gauge runout ÷ 0.806
Example:
When dial gauge runout is 0.285 mm (0.0112 in),
Backlash =
0.285 mm (0.0112 in) ÷ 0.806 = 0.35 mm (0.014 in)
If the backlash is too large compared to the standard
value, increase the forward bevel gear shim thickness
and recheck the backlash.
If the backlash is too small compared to the standard
value, reduce the forward bevel gear shim thickness
and recheck the backlash.
• Inspect the reverse bevel gear backlash after
adjustment of the pinion gear shim (page 17-41).
[1]
[3]
[2]
[4]
[1]
Viewed from the upper side:
TOOLS:
Backlash indicator tool [1]
07SPJ-ZW0030B
Backlash inspection tool set
070PJ-ZX20200
STANDARD VALUE:
0.40 – 0.65 mm (0.016 – 0.026 in)
[1]
[4]
[3]
[2]
Summary of Contents for BFT 250A
Page 92: ...MEMO dummyhead dummyhead...
Page 122: ...MEMO dummyhead dummyhead...
Page 250: ...MEMO dummyhead dummyhead...
Page 322: ...MEMO dummyhead dummyhead...
Page 342: ...MEMO dummyhead dummyhead...
Page 359: ...13 3 dummyhead dummyhead ENGINE REMOVAL INSTALLATION TOOL LIST Engine hanger VSB02C000021...
Page 371: ...14 3 dummyhead dummyhead CYLINDER HEAD 39 2 N m 4 0 kgf m 29 lbf ft 50 53...
Page 373: ...14 5 dummyhead dummyhead CYLINDER HEAD Air supply attachment 07VAJ P8A010A...
Page 414: ...MEMO dummyhead dummyhead...
Page 454: ...MEMO dummyhead dummyhead...
Page 552: ...MEMO dummyhead dummyhead...
Page 554: ...18 2 dummyhead dummyhead MOUNT MOUNT COMPONENT LOCATION 83 N m 8 5 kgf m 61 lbf ft...
Page 606: ...MEMO dummyhead dummyhead...
Page 608: ...20 2 dummyhead dummyhead CONTROLS CONTROLS COMPONENT LOCATION...