![TOHATSU BFT 250A Service Manual Download Page 205](http://html1.mh-extra.com/html/tohatsu/bft-250a/bft-250a_service-manual_1124640205.webp)
5-83
dummyhead
dummyhead
FUEL SYSTEM
INSTALLATION
Replace the O-ring with a new one [1] and install the
pressure regulator [2].
Install the pressure regulator to the L. fuel pipe [3] with
two bolts [4].
Coat a new seal ring (7.45 x 3.61 mm) [1] and a new O-
ring (7.47 x 3.6 mm) [2] with engine oil, and install them
to the injector [3].
• Install the O-ring and seal ring in their proper
locations.
Install all injectors [1] into the fuel pipes [2].
• Insert the fuel injectors straight into the fuel pipe. Do
not insert them into the fuel pipe slanted, and do not
insert them with force. Damage to the O-rings can
occur.
Install injector clips A [3] and tighten the bolts (6 x 10
mm) [4] to the fuel pipes.
• To prevent damage to the O-ring, install the injectors
in the fuel pipe first, and then install them in the
injector bases.
[2]
[1]
[4]
[3]
[2]
[1]
[3]
[1]
[4]
[3]
[2]
Summary of Contents for BFT 250A
Page 92: ...MEMO dummyhead dummyhead...
Page 122: ...MEMO dummyhead dummyhead...
Page 250: ...MEMO dummyhead dummyhead...
Page 322: ...MEMO dummyhead dummyhead...
Page 342: ...MEMO dummyhead dummyhead...
Page 359: ...13 3 dummyhead dummyhead ENGINE REMOVAL INSTALLATION TOOL LIST Engine hanger VSB02C000021...
Page 371: ...14 3 dummyhead dummyhead CYLINDER HEAD 39 2 N m 4 0 kgf m 29 lbf ft 50 53...
Page 373: ...14 5 dummyhead dummyhead CYLINDER HEAD Air supply attachment 07VAJ P8A010A...
Page 414: ...MEMO dummyhead dummyhead...
Page 454: ...MEMO dummyhead dummyhead...
Page 552: ...MEMO dummyhead dummyhead...
Page 554: ...18 2 dummyhead dummyhead MOUNT MOUNT COMPONENT LOCATION 83 N m 8 5 kgf m 61 lbf ft...
Page 606: ...MEMO dummyhead dummyhead...
Page 608: ...20 2 dummyhead dummyhead CONTROLS CONTROLS COMPONENT LOCATION...