![TOHATSU BFT 250A Service Manual Download Page 130](http://html1.mh-extra.com/html/tohatsu/bft-250a/bft-250a_service-manual_1124640130.webp)
5-8
dummyhead
dummyhead
FUEL SYSTEM
INSPECTION AT ECM CONNECTOR
• Always clean around and keep any foreign material
away from the ECM [1] connector before
disconnecting it.
• A faulty PGM-FI system is often related to poorly
connected or corroded terminals. Check those
connections before proceeding.
• In testing at the ECM connector (wire harness side)
terminal, always use the test probe. Insert the test
probe into the connector terminal, and then attach
the digital multimeter probe to the test probe.
FINAL PROCEDURE (AFTER
TROUBLESHOOTING)
Clear the DTCs from the ECM using the procedures
shown on page 5-6.
Disconnect the SCS service connector from the DLC
and connect the dummy connector.
Note that the MIL stays ON while the SCS service
connector is connected to the DLC.
TOOL:
Test probe [2]
07ZAJ-RDJA110
[2]
[1]
Summary of Contents for BFT 250A
Page 92: ...MEMO dummyhead dummyhead...
Page 122: ...MEMO dummyhead dummyhead...
Page 250: ...MEMO dummyhead dummyhead...
Page 322: ...MEMO dummyhead dummyhead...
Page 342: ...MEMO dummyhead dummyhead...
Page 359: ...13 3 dummyhead dummyhead ENGINE REMOVAL INSTALLATION TOOL LIST Engine hanger VSB02C000021...
Page 371: ...14 3 dummyhead dummyhead CYLINDER HEAD 39 2 N m 4 0 kgf m 29 lbf ft 50 53...
Page 373: ...14 5 dummyhead dummyhead CYLINDER HEAD Air supply attachment 07VAJ P8A010A...
Page 414: ...MEMO dummyhead dummyhead...
Page 454: ...MEMO dummyhead dummyhead...
Page 552: ...MEMO dummyhead dummyhead...
Page 554: ...18 2 dummyhead dummyhead MOUNT MOUNT COMPONENT LOCATION 83 N m 8 5 kgf m 61 lbf ft...
Page 606: ...MEMO dummyhead dummyhead...
Page 608: ...20 2 dummyhead dummyhead CONTROLS CONTROLS COMPONENT LOCATION...