![Tektronix 2440 User Manual Download Page 148](http://html1.mh-extra.com/html/tektronix/2440/2440_user-manual_1078860148.webp)
Perform ance C heck and Functional Verification Procedure
2440 Service
VERTICAL SYSTEM
Equipment Required (see tab le 4-1)
Leveled Sine-Wave Generator (Item 1)
10X Attenuator (Item 13)
Calibration Generator (Item 3)
5X Attenuator (Item 14)
Power Supply (Item 6)
2X Attenuator (Item 15)
IX Probe (Item 17)
50
Cl
Coaxial Cable (Item 10)
50 f t Precision Coaxial Cable (Item 11)
Dual-Input Coupler (Hem 18)
1. Verify CH 1 and CH 2 50 n OVERLOAD
Protection.
a.
Recall the Initial Front-Panel Setup, labeled “FPNL"
(see step i in “INITIAL S E T U P ' at the start of this
procedure). M ake the following changes to the front-pa
nel setup:
NOTE
Changing Front Panel settings before the scope
has recovered from a 50 Cl Overload condition
may cause the scope to “lock up". If the scope
locks up, remove the cause of the overload and
press the POWER switch off and then on.
Set:
CH 1 V O L T S /D IV
1 V
C H 2 V O L T S /D IV
1 V
Select: V E R T IC A L M O D E
Set:
C H 2
O ff
Select: C H 1 C O U P L IN G /IN V E R T
Set:
5 0
Cl
O N | O F F
O FF
S elect: C H 2 C O U P L IN G /IN V E R T
Set:
5 0 f t O N | O F F
O F F
b.
Connect the Power Supply (Power Supply should be
turned off) to the CH 1 OR X input connector via a BNC
Female-to-Dual Banana adapter and a 50
Cl
Coaxial
Cable.
c.
Using the CH 1 VERTICAL PO SITIO N control, align the
trace to the bottom graticule line.
d . Turn on the Power Supply.
e.
Adjust the Power Supply output level until the CH 1
trace rises to 1 division above the center graticule
line (5 V).
f.
Select CH 1 C O U P LIN G /IN V E R Tand set 50
Cl
ON | OFF
to ON.
g.
V E R IF Y -F o r a period of 1 minute, the readout display
does not indicate any overload condition (50
Cl
OVER
LOAD).
h.
Set 50 H ON | O FF to OFF and the CH 1 VOLTS/DIV
to 5 V.
■
CAUTION
I
To
prevent damage to the Input circuitry when in
50 Cl DC coupling mode, the 20 V Power Supply
should be turned off immediately If automatic
OVERLOAD switching does not occur within 15
seconds after applying the power source and
setting the 50 Cl coupling on in part
/.
4-6
Summary of Contents for 2440
Page 4: ......
Page 12: ......
Page 38: ......
Page 91: ...Theory of Operation 2440 Service 3 49 Figure 3 5 Simplified CCD architecture ...
Page 120: ...Theory of Operation 2440 Service Figure 3 10 DC Restorer 3 78 ...
Page 130: ...Theory of Operation 2440 Service 3 88 ...
Page 136: ...Theory of Operation 2440 Service Figure 3 15 PWM Regulator and Inverter 3 94 ...
Page 138: ...Theory of Operation 2440 Service Figure 3 16 PWM switching waveforms 3 96 ...
Page 208: ......
Page 322: ......
Page 419: ......
Page 423: ...2440 Service Figure 9 4b 2440 Block diagram part 2 6330 27 BLOCK DIAGRAM PART 2 ...
Page 427: ......
Page 428: ...2440 Service WAVEFORMS FOR DIAGRAM 1 6 2 8 5 3 2 ...
Page 429: ......
Page 432: ...2440 Service WAVEFORMS FOR DIAGRAM 2 BUS ISOLATED 6 6 0 3 4 9 ...
Page 433: ...WAVEFORMS FOR DIAGRAM 2 ...
Page 439: ......
Page 445: ......
Page 450: ...2440 Service WAVEFORMS FOR DIAGRAM 8 6603 27 ...
Page 455: ...W A V EFO R M S FOR D IAG RAM 11 WAVEFORMS FOR DIAGRAM 11 6603 29 ...
Page 458: ...WAVEFORMS FOR DIAGRAM 12 ...
Page 463: ...WAVEFORMS FOR DIAGRAM 14 ...
Page 471: ... C N i u i t e x r 4 j u J l i 1 i 6 28 5 44 WAVEFORMS FOR DIAGRAM 18 ...
Page 476: ...WAVEFORMS FOR DIAGRAM 20 ...
Page 490: ...YES ...
Page 492: ......
Page 494: ......
Page 499: ...YES ...
Page 501: ......
Page 502: ...2440 Service FIG 1 C A B IN E T ...
Page 503: ......
Page 510: ...2440 Service SISSVHO Z Old ...
Page 511: ......
Page 512: ...A12 2440 Service F IG 3 C IR C U IT BOARDS ...
Page 513: ......
Page 517: ...10 16 R E V J U L 1993 Replaceable Mechanical Parts ...
Page 518: ...2440 Service ...
Page 519: ...FIG 4 L V H V PWR SUPPLY ...
Page 520: ...FIG 5 ACCESSORIES 2440 Service ...
Page 521: ......
Page 523: ......
Page 529: ......
Page 530: ......
Page 531: ......