Installing HiPath 3000
Nur für den internen Gebrauch
A31003-H3590-S100-7-7620, 06/2012
4-78
HiPath 3000/5000 V9, Service documentation
inst_h3.fm
Installing HiPath 3800
4.1.7.3.2
Connecting Lines to the External S
0
Patch Panel
CABLUs must be manually connected to the S
0
patch panel (Figure 4-46). You can use the Kro-
ne wiring tool for this.
Figure 4-45
Assignment of the S
0
Patch Panel C39104-Z7001-B3
Figure 4-46
Laying Wire Pairs at the S
0
Patch Panel
... 7
5
3
1
23
21
19
17 ...
... 8
6
4
2
24
22
20
18 ...
3 x 8 MW8 jacks, numbering
8
1
:
Pin
MW8 jack assignment:
as a subscriber line
as a trunk connection
3
Tr
R
4
R
Tr
5
Receive –
Transmit –
6
Transmit –
Receive –
8 7 6 3 2 1 4 5
Pin assignment of MW8 jacks
Twist the wire pairs before laying them.
Summary of Contents for HiPath 3000 Series
Page 1252: ......