Starting HiPath 3000 as a Gateway
Nur für den internen Gebrauch
A31003-H3590-S100-7-7620, 06/2012
7-6
HiPath 3000/5000 V9, Service documentation
start_3g.fm
Starting HiPath 3500 as a Gateway
8.
Making Trunk Connections
Refer to the following board descriptions for information:
●
STLS4R - for S
0
trunk connection
●
- for the S
2M
trunk connection
●
TST1 (for U.S. only) - for T1 PRI trunk
Note: Analog workpoint clients can be connected to the
’s T/R ports in emer-
gencies. This ensures telephone operation via the telecommunications network in
the event of IP network failure.
9.
Making IP connections
Perform the IP connection over the HG 1500 board,
For information on configuration, refer to the HG 1500 Administration Manual.
10.
Performing a Visual Inspection, page 4-123
Startup of HiPath 3500 (Section 5.2)
1.
Supplying the System With Power, page 5-12 (starting system boot).
Note (for Brazil only): The AC power of the system is internally equipped with tran-
sient overvoltage protection up to approx. 2 kV. Since additional lightning protec-
tion is prescribed for Brazil, the AC power of the system must be conducted through
the outlet strip with overvoltage protection (part number C39334-Z7052-C33). In
this way, transient overvoltage protection is guaranteed up to approx. 4 kV.
2.
Carrying Out a System Reload, page 5-15
3.
Carrying Out the Country Initialization and Selecting the Password Type, page 5-15
4.
Not for U.S.: Entering the System Number, page 5-17
5.
Conducting customer-specific programming with HiPath 3000/5000 Manager E.
Refer to the HiPath 3000/5000 Manager E Help for information on programming in-
dividual features.
Table 7-2
HiPath 3500 as a GW, Procedure for System Installation and Startup
Step
Activity (Remarks)
Summary of Contents for HiPath 3000 Series
Page 1252: ......