PART 1: CX-Programmer
OMRON
CHAPTER 4 – Reference
CX-Programmer _Page 71
before going online.
•
If
Transfer to PLC
is selected, the program will be downloaded to the PLC before
going online.
On-line editing can now take place, as it would be accomplished offline. The final END instruction cannot be
edited on-line.
Once normal editing is completed, select the
Send On-line Edit Changes
button from the
toolbar. The changes are committed to the PLC. If the changes are successful, the edited area
of the Ladder program returns to read-only mode.
The on-line edit can be cancelled at any point prior to committing the changes by selecting the
Cancel On-line Edit
Changes
button from the toolbar. The program is restored to prior to
starting on-line editing.
Select
Go to on-line edit rung
to go to the top of the on-line editing rung.
Working on rungs while the PLC is connected, and being able to easily change the program is one of the
quickest ways to complete and check a project. With the PLC running in Monitor mode it is possible to make
changes as if the PLC were not connected. The difference is that once a rung has been completed, it can be
downloaded to the PLC while the program is running.
When performing on-line editing, all rungs must be complete and valid before they can be transferred, whereas
in offline editing, an invalid rung and program can be saved at any time.
Uploading Program/s from the PLC
A program can be uploaded from the currently connected PLC into the open project. All associated program
data (for example symbol details and IO table) are uploaded.
Use the following procedure to transfer a program from the PLC.
1, 2, 3…
1. Select the PLC object in the project workspace.
2. Select
the
Work On-line
button from the toolbar. A confirmation message is displayed;
select the
Yes
pushbutton to connect to the PLC.
Summary of Contents for Sysmac WS02-CXPC1-EV3
Page 1: ...Cat No W414 E1 01 SYSMAC...
Page 2: ......
Page 3: ...SYSMAC WS02 CXPC1 EV3 CX Programmer Ver 3 1 Operation Manual Revised November 2002...
Page 4: ......
Page 6: ......
Page 7: ...PART1 CX Programmer...
Page 8: ......
Page 24: ......
Page 34: ......
Page 106: ......
Page 130: ......
Page 131: ...PART 2 CX Server PLC Tools...
Page 132: ......
Page 136: ......
Page 158: ......
Page 168: ......
Page 194: ......
Page 206: ......
Page 250: ......
Page 298: ......
Page 304: ......
Page 305: ...PART 3 CX Server Runtime...
Page 306: ......
Page 310: ......
Page 338: ......
Page 344: ......
Page 378: ......
Page 384: ......
Page 388: ......