PART 2: CX-Server PLC Tools
CHAPTER 10 – Data Link Editor
OMRON
CX-Server PLC Tools_Page 106
2 Click
the
Yes
button.
The set data will be transferred from the PLC and displayed at the Automatic Datalink (Controller Link) or
the Automatic Datalink Setup dialog box.
Monitoring Data Link Status
Monitoring Data Link Status, Such as Communications Cycle Time
1
Select the startup node PLC in the Project workspace.
2 Select
Open
from the
PLC
menu to connect online.
3
Select Data Link | Setup.
4 Select
Controller Link
or
SYSMAC LINK
, and then click the
OK
button. The Datalink Component dialog
box will be displayed.
5 Select
Online
and then
Datalink Operation/Status
. The Data Link Status dialog box will be displayed.
6
The following items will be displayed in the Network Properties field:
Data link start word, polling node number, communications cycle time, and data link refresh cycle time
PV/maximum value.
The following items will be displayed in the Operational Status field for each node:
CPU Unit error status, data link operation status, CPU unit operation mode, and communications status
Monitoring Data Link Status and Network Error Status from CX-Net
1
While online, open the I/O table window and select either
Controller Link
or
SYSMAC LINK
. Right-click
and select the software switch.
2
The following items can be monitored for a particular Controller Link Unit.
Tag name
Contents
General
Displays the words allocated in the CIO and DM Areas.
Error Information
Network parameter errors, data link table errors, routing table errors,
PLC setup errors, EEPROM write errors, node address duplication
errors, network parameter verification errors, communications
controller transmission errors, communications controller errors, and
error log
Data Link
Startup node address, polling node address, and local node data link
participation status
Data link status as seen from each node (PLC operation status, PLC
errors, communications errors, data link participation status, offset
errors, and reception area insufficient or surplus space)
Network Status
Network participation status for each node
Status
Termination resistance status, power ON status
Summary of Contents for Sysmac WS02-CXPC1-EV3
Page 1: ...Cat No W414 E1 01 SYSMAC...
Page 2: ......
Page 3: ...SYSMAC WS02 CXPC1 EV3 CX Programmer Ver 3 1 Operation Manual Revised November 2002...
Page 4: ......
Page 6: ......
Page 7: ...PART1 CX Programmer...
Page 8: ......
Page 24: ......
Page 34: ......
Page 106: ......
Page 130: ......
Page 131: ...PART 2 CX Server PLC Tools...
Page 132: ......
Page 136: ......
Page 158: ......
Page 168: ......
Page 194: ......
Page 206: ......
Page 250: ......
Page 298: ......
Page 304: ......
Page 305: ...PART 3 CX Server Runtime...
Page 306: ......
Page 310: ......
Page 338: ......
Page 344: ......
Page 378: ......
Page 384: ......
Page 388: ......