
D-74
(2)
Adjustment of Turnover Roller Retraction Solenoid
Requirement
The gap between the E-ring of the plunger and the Retraction Solenoid should be 3 ± 0.2
mm when the Retraction Solenoid OFF.
Adjustment Procedure
3. Move the Retraction Solenoid so that the gap between the E-ring of the plunger and the
Solenoid is 3 ± 0.2 mm when the Retraction Solenoid OFF.
4. After adjustment is completed, tighten the two Retraction Solenoid mounting screws.
1. Slide out the Fusing Unit.
2. Loosen two screws by which the Retraction Sole-
noid is mounted.
4002D210AC
4002D012AA
3 ± 0.2 mm
Summary of Contents for DI450
Page 13: ......
Page 14: ...DIS REASSEMBLY ADJUSTMENT ...
Page 15: ......
Page 138: ...SWITCHES ON PWBs TECH REP SETTINGS ...
Page 139: ......
Page 141: ......
Page 161: ...S 20 Punch Loop Adjust Tech Rep Mode Sensors Port Signals Finisher I O Check ...
Page 187: ......
Page 188: ...TROUBLESHOOTING 13430 ...
Page 189: ......