
T-60
C0996
C0997
Step
Check
Result
Action
1
3
rd
Drawer Lock Solenoid operation: the volt-
age across PJ10A-6 on Control Board and
GND is DC24V (solenoid deenergized) and
DC0V (solenoid energized) when the Paper
Descent key is pressed and the Main Tray com-
pletes its descent motion.
YES
Change solenoid.
NO
Change Control Board.
Step
Check
Result
Action
1
Shift Gate Motor rotation: the voltage across
PJ7A-2B on Control Board and GND is DC0V
(motor deenergized) and DC24V (motor ener-
gized) when the drawer is slid in with paper
loaded on the Shift Tray only.
YES
Correct drive coupling.
Change motor or flat
cable.
NO
Change Control Board.
Change Cabinet Transport
Board.
2
I/O check for Shift Gate Position Sensor opera-
tion: the voltage across PJ7A-1B on Control
Board and GND is DC5V (sensor unblocked)
and DC0V (sensor blocked) when the drawer is
slid in with paper loaded on the Shift Tray only.
YES
Change Control Board.
Change Cabinet Transport
Board.
NO
Change sensor.
Change flat cable.
Summary of Contents for DI450
Page 13: ......
Page 14: ...DIS REASSEMBLY ADJUSTMENT ...
Page 15: ......
Page 138: ...SWITCHES ON PWBs TECH REP SETTINGS ...
Page 139: ......
Page 141: ......
Page 161: ...S 20 Punch Loop Adjust Tech Rep Mode Sensors Port Signals Finisher I O Check ...
Page 187: ......
Page 188: ...TROUBLESHOOTING 13430 ...
Page 189: ......