Gemini VII
Preventive Maintenance
239-42828-01 - Dec 2012
9-7
Replacing the Sample Tube O-ring
It is important to maintain a vacuum-tight seal near the top of the sample tube stem. If an O-ring
becomes worn or cracked, it does not provide a good seal and will need to be replaced.
1. Holding the sample tube firmly with one hand, loosen the sample tube connector nut by turning
counterclockwise.
2. Carefully pull the sample tube down until it is free from the port. It may be necessary to grasp the
sample tube with both hands.
3. Remove the O-ring from the top of the sample tube and replace it with a new one.
4. After the new O-ring is in place, insert the sample tube back into the sample port until it is fully
seated.
5. Slide the sample tube connector nut up the tube (the ferrule and O-ring will move along with the
connector nut). Then, turning clockwise,
hand-tighten
the connector nut to the sample connector.
Before removing (or installing) a sample tube, ensure that the port valve is closed.
Observe the instrument schematic to verify valve status.
Be careful not to let the sample tube connector nut drop onto the bottom of the tube as
it may break the tube.
Be sure to use the proper size frit for the sample port. The instrument will not operate
properly if the incorrect frit size is used.
If the O-ring remains inside the sample port, use a pair of tweezers or needle-nose
pliers to remove it.
O-ring
Ferrule
Connector nut
Summary of Contents for Gemini VII 2390a
Page 1: ...Gemini VII Operator s Manual V3 02 239 42828 01 Jan 2014...
Page 4: ......
Page 12: ...Table of Contents Gemini VII viii 239 42828 01 Nov 2013...
Page 36: ...Menu Structure Gemini VII 2 14 239 42828 01 Dec 2012...
Page 192: ...Service Test Gemini VII 6 24 239 42828 01 Dec 2012...
Page 217: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 25 Isotherm Linear Plot...
Page 218: ...Report Examples Gemini VII 7 26 239 42828 01 Dec 2012 BET Surface Area Report...
Page 219: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 27 BET Surface Area Plot...
Page 220: ...Report Examples Gemini VII 7 28 239 42828 01 Dec 2012 t Plot...
Page 221: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 29 BJH Adsorption Cumulative Pore Volume...
Page 222: ...Report Examples Gemini VII 7 30 239 42828 01 Dec 2012 BJH Adsorption dV dlog w Pore Volume...
Page 264: ......
Page 266: ......
Page 294: ...Appendix B Gemini VII B 28 239 42828 01 Nov 2013...
Page 364: ...Appendix F Gemini VII F 18 239 42828 01 Dec 2012...
Page 372: ...Gemini VII Smart VacPrep Operator Manual Dec 2013 G 1 G Smart VacPrep Operator Manual...
Page 380: ...Contact Us vi Smart VacPrep Operator Manual...
Page 390: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Page 424: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...