
Connecting Gases
Gemini VII
9-18
239-42828-01 - Dec 2012
Connecting Gases
Guidelines for Connecting Gases to the Analyzer
Guidelines when installing regulators and gas lines:
• Place gas bottles close to the analyzer. Using gas line extenders on gas bottles located in remote
areas may degrade gas quality and reduce pressure.
• Use a retaining strap (or other appropriate tether) to secure the gas bottle.
• Carefully route the gas lines from the bottle to the analyzer avoiding overlapping or entangling gas
lines.
• Label the gas line at the instrument inlet for proper identification and maintenance.
• Ensure the gas bottle is closed before connecting to the analyzer.
The following instructions describe a typical installation. Some configurations require additional com-
ponents, for example, regulator expansion kits, when one gas source will be used for several operations
or when the gas bottle cannot be located close to the analyzer.
Disconnecting the Depleted Bottle
1.
Close the gas bottle shut-off valve then open the regulator shut-off valve.
Gas bottle
shut-off valve
Regulator
shut-off
valve
This procedure is also shown in one of the How-To videos located on the Help menu.
In order to use oxygen, the analyzer must be equipped with an oxygen-compatible
vacuum pump that uses Fomblin
®
(or a suitable equivalent) pump oil or a dry pump.
Failure to use the proper vacuum system could result in hazardous conditions
including fire and personal injury.
Summary of Contents for Gemini VII 2390a
Page 1: ...Gemini VII Operator s Manual V3 02 239 42828 01 Jan 2014...
Page 4: ......
Page 12: ...Table of Contents Gemini VII viii 239 42828 01 Nov 2013...
Page 36: ...Menu Structure Gemini VII 2 14 239 42828 01 Dec 2012...
Page 192: ...Service Test Gemini VII 6 24 239 42828 01 Dec 2012...
Page 217: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 25 Isotherm Linear Plot...
Page 218: ...Report Examples Gemini VII 7 26 239 42828 01 Dec 2012 BET Surface Area Report...
Page 219: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 27 BET Surface Area Plot...
Page 220: ...Report Examples Gemini VII 7 28 239 42828 01 Dec 2012 t Plot...
Page 221: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 29 BJH Adsorption Cumulative Pore Volume...
Page 222: ...Report Examples Gemini VII 7 30 239 42828 01 Dec 2012 BJH Adsorption dV dlog w Pore Volume...
Page 264: ......
Page 266: ......
Page 294: ...Appendix B Gemini VII B 28 239 42828 01 Nov 2013...
Page 364: ...Appendix F Gemini VII F 18 239 42828 01 Dec 2012...
Page 372: ...Gemini VII Smart VacPrep Operator Manual Dec 2013 G 1 G Smart VacPrep Operator Manual...
Page 380: ...Contact Us vi Smart VacPrep Operator Manual...
Page 390: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Page 424: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...