5 Smart VacPrep Diagnostics
Field or Button
Description
Available Tests drop-
down list
Select one or more tests to run unattended. Select the test and click the
Insert button for the test to display in the Test Sequence box.
Cancel
Discards any changes or cancels the current process.
Intervention Required
Check this option if any test requiring operator intervention should be
skipped if the operator does not respond within the specified time.
OK
Saves and closes the active window.
Start Test Sequence if
Instrument is Idle Any
Time Between
Enter a From and To time for an unattended test to begin if the instrument
is idle at any time during the entered time frame.
Test Frequency
Select how often the test is to run unattended.
Test Sequence
Provides the test file identification and estimated run time. A check mark
in the Intervention Required column indicates that operator intervention is
required. Click Delete to remove the selected test or Clear to clear the
entire table of all entries. To add a test to the test sequence, highlight a
row in the Test Sequence box, select a test from the Available Tests list
and click Insert. The new test will be inserted above the highlighted row.
Select a row and click Delete to remove the test from the sequence.
Select Clear to remove all entries from the Test Sequence box.
Schedule Diagnostics Fields and Buttons Table
5 - 2
Smart VacPrep Operator Manual
Summary of Contents for Gemini VII 2390a
Page 1: ...Gemini VII Operator s Manual V3 02 239 42828 01 Jan 2014...
Page 4: ......
Page 12: ...Table of Contents Gemini VII viii 239 42828 01 Nov 2013...
Page 36: ...Menu Structure Gemini VII 2 14 239 42828 01 Dec 2012...
Page 192: ...Service Test Gemini VII 6 24 239 42828 01 Dec 2012...
Page 217: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 25 Isotherm Linear Plot...
Page 218: ...Report Examples Gemini VII 7 26 239 42828 01 Dec 2012 BET Surface Area Report...
Page 219: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 27 BET Surface Area Plot...
Page 220: ...Report Examples Gemini VII 7 28 239 42828 01 Dec 2012 t Plot...
Page 221: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 29 BJH Adsorption Cumulative Pore Volume...
Page 222: ...Report Examples Gemini VII 7 30 239 42828 01 Dec 2012 BJH Adsorption dV dlog w Pore Volume...
Page 264: ......
Page 266: ......
Page 294: ...Appendix B Gemini VII B 28 239 42828 01 Nov 2013...
Page 364: ...Appendix F Gemini VII F 18 239 42828 01 Dec 2012...
Page 372: ...Gemini VII Smart VacPrep Operator Manual Dec 2013 G 1 G Smart VacPrep Operator Manual...
Page 380: ...Contact Us vi Smart VacPrep Operator Manual...
Page 390: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Page 424: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...