Check
0DNHVXUHWKDWWKH¿HOGVHOHFWHGHOHFWULFDOFRPSRQHQWVPDLQSRZHUVZLWFKHVFLUFXLWEUHDNHUVZLUHV
conduit connectors and wire terminals) have been properly selected according to the electrical data
given in the “Engineering Manual”. Make sure that the components comply with the National Electrical
Code (NEC).
(2) Check to ensure that the power supply voltage is within ±10% of the rated voltage.
(3) Check the capacity of the electrical wires.
If the power supply capacity is too low, the system cannot be started due to the voltage drop.
(4) Check to ensure that the ground wiring is connected.
Ɣ
$OOHOHFWULFDOZRUNPXVWEHGRQHDVRXWOLQHGLQWKLVPDQXDODQGLQDFFRUGDQFHZLWKWKLVPDQXDO
6XEVWDQGDUGZRUNFDQUHVXOWLQ¿UHDQGGDPDJHWRWKHXQLW
Ɣ
8VHVSHFL¿HGFDEOHVEHWZHHQXQLWVDQGFKRRVHWKHFDEOHVFRUUHFWO\,IQRWDQHOHFWULFDOVKRFNRU
¿UHPD\RFFXU
Ɣ
'RQRWRSHQWKHVHUYLFHFRYHURUDFFHVVSDQHOIRUWKHLQGRRURURXWGRRUXQLWVZLWKRXWWXUQLQJ2))
WKHPDLQSRZHUVXSSO\,WFDQUHVXOWLQDQHOHFWULFDOVKRFN
Ɣ
7XUQ2))WKHPDLQSRZHUVZLWFKRIWKHLQGRRUXQLWDQGWKHRXWGRRUXQLWEHIRUHDWWHPSWLQJDQ\HOHFWULFDO
ZLULQJZRUNRUDSHULRGLFDOFKHFNLVSHUIRUPHG,IQRWLWZLOOUHVXOWLQDQHOHFWULFVKRFNRUD¿UH
Ɣ
&KHFNWRHQVXUHWKDWWKHLQGRRUIDQDQGWKHRXWGRRUIDQKDYHVWRSSHGEHIRUHDWWHPSWLQJDQ\
HOHFWULFDOZLULQJZRUNRUIRUDQ\VFKHGXOHGHOHFWULFDOZRUNWKDWLVEHLQJSHUIRUPHG
Ɣ
7LJKWHQVFUHZVDFFRUGLQJWRWKHIROORZLQJWRUTXH
0IWāOEV1āP
0 WRIWāOEVWR1āP
Ɣ
6HFXUHDOOFDEOHVWRJHWKHUZLWKFDEOHFODPSVDQGVHDOWKHFRQQHFWLQJKROHDJDLQVWWKHRQVODXJKWRI
PRLVWXUHDQGLQVHFWV
Ɣ
5XQWKHHOHFWULFDOZLULQJWKURXJKWKHFRQQHFWLQJKROHLQWKHVLGHFRYHUZKHQXVLQJFRQGXLW
Ɣ
6HFXUHWKHZLUHGFRQWUROOHUFDEOHXVLQJWKHFDEOHFODPSLQVLGHWKHHOHFWULFDOER[
8.2 Electrical Wiring Capacity
8.2.1 Field Minimum Wire Sizes for Power Supply
x
This equipment can be installed with a Ground Fault Circuit Interrupter (GFCI), which is a recognized
PHDVXUHIRUDGGHGSURWHFWLRQWRDSURSHUO\JURXQGHGXQLW,QVWDOODSSURSULDWHVL]HGEUHDNHUV
IXVHVRYHUFXUUHQWSURWHFWLRQVZLWFKHVDQGZLULQJLQDFFRUGDQFHWRORFDOVWDWHDQG1(&FRGHVDQG
requirements. The equipment installer is responsible for understanding and abiding by applicable codes
and requirements.
x
Do not operate the system until all check points have been cleared.
(A) Check to ensure that the electrical resistance is more than 1 megohm, by measuring the resistance
between ground and the terminal of the electrical parts. If it is less than 1 megohm, do not operate
the system until the electrical leakage is found and repaired.
(B) Check to ensure that the stop valves of the outdoor unit are fully opened, and then start the system.
(C) Apply power to the outdoor unit(s) at least 12 hours prior to operation of the system for preheating
of the compressor oil.
x
Do not touch any of the parts by hand at the discharge gas side, since the compressor chamber and
the pipes at the discharge side are heated to higher than 194
o
F (90
o
C).
Summary of Contents for YVAHP072B31S
Page 2: ......
Page 10: ...viii Service Manual ...
Page 16: ......
Page 17: ...Service Manual 1 1 INSTALLATION 1 Installation ...
Page 577: ...Service Manual 1 561 INSTALLATION 9 Touch Back to return to the Service Menu screen 9 ...
Page 920: ......
Page 921: ...Service Manual 2 1 OPERATION 2 Operation ...
Page 1315: ...Service Manual 3 1 TROUBLESHOOTING 3 Troubleshooting ...
Page 1461: ...Service Manual 4 1 MAINTENANCE 4 Maintenance ...
Page 1728: ......
Page 1729: ...Service Manual 6 1 FIELD WORK INSTRUCTIONS 6 Field Work Instructions ...
Page 1738: ...6 10 Service Manual FIELD WORK INSTRUCTIONS 6 8 Mollier Chart for R410A ft 3 l b ...
Page 1739: ...SERVICE PARTS LIST Service Manual 7 1 7 Service Parts List ...
Page 1795: ......
Page 1796: ... 2015 Johnson Controls Inc SM 15001 ...