2-310
Service Manual
OPERATION
6. Set the scheduled time, ON/OFF
operation, and temperature.
Ɣ
Select the scheduled item
number (1~10) and set the time.
Ɣ
Select “ON” or “OFF”.
Ɣ
Touch “ ” or “ ” to set the
temperature.
Ɣ
The “- -” symbol displays when
the time and temperature are not
set.
7. Touch “Register” to register
the scheduled functions. Touch
“Cancel” and a scheduled operation
will be canceled.
Ɣ
To set the same day of the week,
refer to step (5) above.
Ɣ
To set other days of the week,
refer to
step
(4) above.
8. Touch “Back” to set the timer for
other groups. The screen will
return to “Schedule Timer Setting”,
Refer to step (2) above.
Ɣ
After the schedule is set, the
registered schedule number
(1-64) will be displayed in the
Group button.
(The scheduled Group button
turns blue.)
Ɣ
If settings are the same, the
same registered schedule
number will be displayed.
9.
Touch “Done” to return the “Monitor
1 (All Groups)” or “Monitor 2
(Block)”.
Ɣ
If “Done” is touched without
a registration action, those
scheduled items are cancelled.
And the screen will be changed
to “Monitor 1 (All Groups)” or
“Monitor 2 (Block)”.
NOTE:
Make sure that the time and ON/OFF are set for the timer setting.
(It is not necessary to set the temperature.)
0:00
1:00
2:00
1:30
1:00
2:00
3:00
1:30
The schedule cannot be performed.
The schedule will
be performed.
The schedule will be performed.
1:00
2:00
3:00
4:00
2:30
Ŷ6FKHGXOHSURFHVVZKHQ'D\OLJKW6DYLQJ7LPHLVRSHUDWLQJ
<Starting Time>
When starting at 2:00 with a 1 hour
shifting time, the schedule set at
2:30 cannot be performed.
<Ending Time>
When ending at 2:00 with a 1 hour
shifting time, the schedule set at
0:30 will be performed twice.
Daylight Saving Time (DST)
8
6
7
9
Schedule
Item No.
Registered
Schedule No.
Summary of Contents for YVAHP072B31S
Page 2: ......
Page 10: ...viii Service Manual ...
Page 16: ......
Page 17: ...Service Manual 1 1 INSTALLATION 1 Installation ...
Page 577: ...Service Manual 1 561 INSTALLATION 9 Touch Back to return to the Service Menu screen 9 ...
Page 920: ......
Page 921: ...Service Manual 2 1 OPERATION 2 Operation ...
Page 1315: ...Service Manual 3 1 TROUBLESHOOTING 3 Troubleshooting ...
Page 1461: ...Service Manual 4 1 MAINTENANCE 4 Maintenance ...
Page 1728: ......
Page 1729: ...Service Manual 6 1 FIELD WORK INSTRUCTIONS 6 Field Work Instructions ...
Page 1738: ...6 10 Service Manual FIELD WORK INSTRUCTIONS 6 8 Mollier Chart for R410A ft 3 l b ...
Page 1739: ...SERVICE PARTS LIST Service Manual 7 1 7 Service Parts List ...
Page 1795: ......
Page 1796: ... 2015 Johnson Controls Inc SM 15001 ...