10 EXHAUST
(FE US)
-
Remove screws
O
of connecting cap
8.
-
Remove connecting cap with the perforated pipe, 0-
ring (D, and glass fiber yarn filling
8.
-
Remove screws
C,
and silencer cap
(D
with 0-ring
@.
-
Remove screws
@)
and insert
@)
together with insulat-
ing pad Gi).
-
Remove the insulating pad from the insert.
-
Clean the parts that need to be reinstalled and check for
damage.
-
Mount the new insulating pad on the insert and fasten
with adhesive tape.
-
Position the insert with the insulating pad in outer
tube
G,.
-
Mount and tighten screws
@).
Guideline
Screws on the
main silencer
M5
-
Mount 0-ring (D on the silencer cap.
7 Nm (5.2 lbf ft)
-
Fit the new glass fiber yarn filling onto the perforated
pipe.
-
Fit the connecting cap with the glass fiber yarn filling in
the outer tube.
Info
Press the glass fiber yarn filling into the outer tube
using a blunt tool.
-
Mount and tighten screws
O.
Guideline
Screws on the
main silencer
M5
-
Mount 0-ring @ on the silencer cap.
7 Nm (5.2 lbf ft)
-
Position the silencer cap with 0-ring @ in the outer tube.
-
Mount and tighten screws
0.
Guideline
Screws on the
main silencer
Finishing work
M5
-
Install the main silencer. (
a
p. 87)
-
Install the right side cover. (
a
p. 96)
7 Nm (5.2 lbf ft)
89
Summary of Contents for F2203P4
Page 2: ......
Page 293: ...29 SERVICE SCHEDULE 291 ...