![HP 316095-B21 - StorageWorks Edge Switch 2/24 Service Manual Download Page 98](http://html.mh-extra.com/html/hp/316095-b21-storageworks-edge-switch-2-24/316095-b21-storageworks-edge-switch-2-24_service-manual_164139098.webp)
2–78
edge switch 2/24 service manual
Diagnostics
36
Install an SFP optical transceiver in the port receptacle (
RRP 1: SFP Optical
Transceiver on page 4–2
).
a. This procedure is concurrent and can be performed while switch power is on.
b. Verify the location of the failed port.
c. Perform an external loopback test for the port as part of FRU removal and
replacement.
Exit MAP.