SVS/12
62
994.530 G01 02
11. Remove the filling hose from the cable box once the grease
in the cable box has cooled down and immediately put your
thumb on the opening, see figure 6. This is necessary as the
grease in the cable box is under pressure.
12. Fit the rubber sealing and push it into the opening of the
cable box, while making a circular movement. Make sure
that the edge snaps behind the wall of the cable box, see
figure 7.
13. Fit the nylon locking pin. There must not be any grease in
the cavity in the rubber sealing.
The lead sheath can now be earthed. Earthing should be
done right above the outer cable sheath so that the cable
box can be lowered, if necessary.
This earth connector has to be attached to the horizontal
earth bar.
6.
7.
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...