4. Saw off the cable box in accordance with the diameter
(d) measured across the lead sheath, see figure 3.
Take into account that several layers of polyethylene
tape are to be applied over the lead sheath.
Deburr sharp edges.
5. Degrease the upper side of the lead sheath and sand it
lightly, for example, with a Scotch Brite scouring pad.
Apply a couple of layers of polyethylene tape to the
lead sheath (see figure 4), so that the diameter
measured across the tape equals the inside
diameter of the cable box.
Make sure that the upper side of the tape is flush
with that of the lead sheath (indicated by arrow).
Smooth out any wrinkles.
6.
Make a hole suitable for the cable diameter in the
grommet. Slide the grommet over the cable, see
figure 5.
7.
Slide the cable box on to the cable terminal
block of the panel.
Pull the cable next to the cable box until the
polyethylene tape protrudes about 10 mm beneath
the cable box.
Mark the cable just above the cable clamp.
8. Remove the cable box from the cable terminal block.
9. Insert the cable into the cable box from below and lower the
cable box on to the cable as far as possible.
N
OTE
Make sure the paper insulation of the cores does
not get damaged.
4.
5.
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...