SVS/12
994.530 G01 02
49
14.
Fasten the cable cores to the connection points
with the cable core clamps, see figure 9.
Make sure that the cable cores are correctly
positioned in the clamps. This is where the
associated cross-sectional area is stated
(see detail).
Tighten the hexagon socket head screws (torque
15 Nm). Make sure that the screws are positioned
well forward in all three phases.
Re-tighten the screws after some time.
15.
Hang a double folded nylon thread over the edge of
each opening in the cable box, with the ends
hanging inside, see figure 10.
Now slide the cable box completely on to the cast
resin insulation.
16. Fit the protection cover on the right side and secure it,
see figure 11. Make sure that the clamping edge of the
cable box adequately rests on the bearing face of the
protection cover.
17. Fit the hose clips on the end of the cable box and
tighten it (torque 5 Nm), see figure 11.
18. Secure the floor plate. Place the grommet in the
floor plate.
19. Fill the cable box with grease (see chapter 3.3.8).
9.
10.
11.
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...