SVS/12
48
994.530 G01 02
10. Fix the cable in the cable clamp at the marked position,
see figures 6 and 7.
Tighten the cable block. Check that the cable lies straight
under the connection. Remove any spacer from the
support of the cable block.
11. Seal the openings of the cable box to prevent intrusion
of dirt.
12.
Cut the cable cores 2 to 3 mm below the cast
resin insulation (figure 7).
Remove the paper insulation from the cable cores
over a distance of 30 mm.
13.
Check that the O-rings are fitted over the cast
resin insulation, see figure 8.
Apply some cable grease to the cast resin
insulation.
6.
7.
8.
Cable terminal block
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...