SVS/12
994.530 G01 02
61
3.
Secure the filling device by firmly tightening the screw in
the top plate, see figure 3.
Using the hose clip, firmly attach the hose to the filling
tube of the filling device.
4. Remove the nylon locking pin and the rubber sealing from
the cable box.
5. Connect the filling hose to the cable box:
insert the nipple as far as possible into the filling hole
and give it a quarter turn. Check that the nipple snaps
into the filling hole interlock.
6. Place the hand-operated pump on the valve and fill the cable
box by pumping
steadily
(to prevent air bubbles from
developing), see figure 4.
The cable box has to be completely filled.
7.
When the grease in the cable box touches the cast resin
insulation, continue pumping steadily until the cable box
has expanded by approximately 2 cm.
Wait for the grease to come out of one of the spigots and
then pull away the nylon thread. Repeat this for the other
spigots.
8. Fit the protection cover on the left side and secure it. Make
sure that the clamping edge of the cable box adequately
rests on the bearing face of the protection cover.
9.
Remove the pump from the valve, see figure 5.
Now depressurise the cable box, using the valve, until
the box remains about 1 cm thicker than before.
The excess filling is necessary to compensate for shrinkage
and any grease absorption by the cable.
Close the filling hose using the shut-off ring.
10. Reduce the pressure on the can by completely opening the
valve.
Undo the hose clip and remove the can from the filling hose.
Hold the can in such a way that the grease from the filling
hose cannot get into contact with the valve.
3.
4.
5.
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...