SVS/12
66
994.530 G01 02
3.
Cut the cable cores 2 to 3 mm below the cast resin
insulation.
Remove the insulation of the cable cores over a distance
of approximately 30 mm.
4. Make a hole suitable for the cable diameter in the grommets.
Slide the grommets over the cable.
5.
Turn the sealing plugs (c) inside out.
Carefully cut a hole in the conical part of the sealing
plugs without making any notches. The diameter of this
hole must be half the diameter of the core insulation.
Turn the sealing plugs back to their normal position.
6. Fit the sealing plugs (c) on the cable, see figure 5.
The assembly sequence depends on whether the guide
cone is situated in (figure 1A) or below (figure 1B) the
insulating conduit.
7.
Insert the rubber sleeves (b) previously greased with
silicone grease upwards into the feed opening of the
insulating conduits (a) and slide the conduits over the
cores, see figure 6.
8.
Fix the cable cores to the connection pins. Make sure
that the cable cores are correctly positioned in the
connection clamps, i.e. at the position indicating the
relevant cross-sectional area.
Tighten the hexagon socket head screws (approx. 15
Nm). Make sure that the screws are positioned straight
forward in all three phases.
Re-tighten the screws after some time.
9. Slide the insulating conduits and the rubber sleeves on to
the cast resin insulated members. Check that the flattened
sides of the washers around the insulating conduits abut.
5.
g
b
g
b
a
a
6.
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...