SVS/12
76
994.530 G01 02
General
The installation is designed in such a way that the front of
the foundation frame and the plinth can be detached, so
that the cables are easy to remove. First it is necessary to
remove the access panels.
If no cables are connected to a panel, the cable connection
must be earthed (switch closed and disconnector in
earthing position).
For extra safety, so-
called “dead ends” can be fitted on the
connection cones. It is also possible to fit earthing
interlocks on the panels (see chapter 4.2.7).
N
OTE
If the cable supports in the panel do not fit the
cables being connected, suitable supports must
be ordered from Eaton.
This is important, so as to guarantee that cables
are securely fastened to the panel, also in case
of a short-circuit current.
3.4.1
Connection of plastic-insulated cables
with plugs
General
For connection via plugs, the panels are provided with
connection cones (figure 1). There are three versions:
complying with EN50181, type C, suitable for T plugs
with screw connection
complying with EN50181, type D, suitable for T plugs
with screw connection
The termination of the cable cores and the connection of
the cables must satisfy the requirements of the
manufacturer concerned.
Examples of plugs of different manufacturers.
Raychem RICS
Kabel Draht SEHDT
Asea Kabeldon Kap 300/400
Euromold K400 TB
Euromold K400 LR
Pirelli
1.
2a. Connection with one cable per phase
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...