SVS/12
64
994.530 G01 02
Required materials (figures 1 and 2)
Three insulating conduits (a)
One bag containing three greased rubber sleeves (b)
Three sealing plugs (c)
Two protection covers (d)
Three guide cones (e) (
< 46 mm or
> 46 mm) (figure 1)
One protection cover (only for guide cones with
> 46 mm)
Three cable core clamps (f)
Cable block (g)
Procedure
1. Remove the floor plate with the rubber grommet.
2. Pull the cable upwards and fasten it, see figure 3. There are
two ways of doing this, depending on the type of cable,
namely:
“3-core cable”
“3x1-core cable” on cable panel
2.1
“3-core cable”
fix the cable in the desired position in the cable clamp.
Move the distance piece until the centre of the cable is
exactly in line with the centre of the cable box.
firmly tighten the cable clamp.
2.
3.
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...