SVS/12
994.530 G01 02
7
1.2 Using this
manual
1.2.1
Target group
The SVS/12 system is designed for use by personnel who
are expert or adequately trained in carrying out electrical
operations. Such personnel include: authorised persons,
team leaders, operators and responsible specialists. For
definitions of these terms, see chapter 8
– Glossary.
The user manual is also aimed at this target group.
1.2.2
Structure of this manual
The manual contains 9 chapters. A distinction is made
between:
light panels (max. 24 kV, 630 A) and
heavy panels (max. 24 kV, 1250 A)
Chapters 1 and 2 contain general information on the
system (design and construction), the manual and on
general safety aspects. The information is presented in the
form of descriptive texts, supported by illustrations as
necessary. Illustrations are numbered consecutively for
each chapter, and are captioned if necessary.
Chapters 3 to 7 consist mainly of step-by-step procedures.
These procedures contain step-by-step descriptions of
actions in the order in which they should be carried out.
Illustrations are on the same page as the relevant step and
have the same number.
R
EMARK
Read through all actions first, using the relevant
figures. Contact Eaton if you do not understand
what you have to do.
N
OTE
Never take any action without knowing what
effect it will have.
Further information regarding chapters 3 to 7 is given
below.
Chapter 3
– Setting up the system
The manual assumes that the installation is assembled
and connected under Eaton supervision. This chapter
therefore contains instructions on transport and
assembly only. It also describes the requirements for
the switchroom and provides an overview of possible
connection configurations.
Chapter 4 - System operation
This chapter is aimed at the operator who is expected
to operate and monitor the system independently. For
that reason, these activities are described in detail.
Chapter 5 - System commissioning and
decommissioning
Chapter 5.1 sets out the actions required before the
system can be commissioned.
These actions should be carried out in conjunction
with Eaton.
Chapter 5.2 deals with decommissioning the system. It
also includes recommendations for the safe disposal of
the system.
Chapter 6 - Inspection, maintenance and repair of the
system
This chapter describes only those operations that may
be carried out by the user.
N
OTE
Operations not included in the manual must be
carried out by or under the supervision of Eaton.
Chapter 7 - Accessories
This chapter contains a list of available accessories.
The other chapters, namely 8 and 9, are by way of general
explanation.
Chapter 8 - Glossary
This chapter contains clarifications of specific terms
used in the manual but not explained further.
Chapter 9
– Appendices
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...