Procedure
1. Remove the floor plate with the rubber grommet.
2. Cut the cable as shown in figure 1.
L1 = 650 mm
R
EMARK
To simplify insertion of the cable cores in the
right tubes of the cable box, it is recommended
to cut the cable cores to different lengths.
3. Finish the cable as shown in figure 4.
L2 = 175 mm
d = diameter across the lead sheath
Remove the lead sheath over distance d. Remove the sharp
edges of the lead sheath.
4.
Make a hole suitable for the cable diameter in the grommet.
Slide the grommet over the cable.
5. Saw off the plastic entry bushing in accordance with the
diameter (d) measured across the lead sheath. Take into
account that several layers of polyethylene tape are to be
applied over the lead sheath.
Deburr sharp edges, see figure 2.
6.
Grease the O-ring using silicone grease or acid-free
Vaseline.
Place the O-ring in the upper recess of the plastic entry
bushing (g), see figure 3.
7. Press the plastic entry bushing in the cable box and fit the
two fixing shells (h) in the lower recess of the entry bushing.
Clamp it using the hose clip (f).
L1=650
L2=175
d
d
1.
2.
3.
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...