SVS/12
994.530 G01 02
5
Voltage indication and phase comparison, 630 A and 1250 A panels ..................... 92
Opening and closing the 600 mm high instrument compartment ............................ 98
Earthing the cable of a 12 - 24 kV load-break switch/fuse panel, 630 A ............... 100
Earthing the cable of a 12 kV load-break switch/fuse panel, 630 A ...................... 102
Three-pole short-circuit-proof back-up earth, 630 A and 1250 A panels ............... 104
Single-pole short-circuit-proof back-up earth, 630 A and 1250 A panels .............. 106
Testing the cable via the 17.5 kV cable terminal block, 630 A and 1250 A panels 111
Testing the cable using right-angle plugs, 630 A and 1250 A panels ................... 112
SYSTEM COMMISIONING AND DECOMMISIONING ........................ 113
SYSTEM INSPECTION, MAINTENANCE AND REPAIR .................... 115
Maintenance intervals, 630 A and 1250 A panels ................................................ 115
Checking and maintenance of the mechanism, 630 A and 1250 A panels ............ 115
Topping up grease-filled cable boxes, 630 A panels ............................................ 118
ACCESSORIES ................................................................................... 123
Summary of Contents for SVS/12
Page 133: ...SVS 12 994 530 G01 02 133 9 2 Voltage detecting system Wega 1 2...
Page 134: ...SVS 12 134 994 530 G01 02...
Page 135: ...SVS 12 994 530 G01 02 135...
Page 136: ...SVS 12 136 994 530 G01 02...
Page 137: ...SVS 12 994 530 G01 02 137 9 3 Phase monitor Orion 3 0...
Page 138: ...SVS 12 138 994 530 G01 02...