Chapter 11: Basic Bring-up Procedure for the C4 CMTS
STANDARD Revision 1.0
C4® CMTS Release 8.3 User Guide
© 2016 ARRIS Enterprises LLC. All Rights Reserved.
330
Bring-up Procedures
The following is a high-level list of the steps of this procedure:
see "
1. Install Cards, Rear PICs, Filler Panels, PCMs, and Fans
(page 331)
see "
(page 332)
see "
(page 333)
see "
(page 333)
see "
5. Configure RCM Ethernet Connections
(page 333)
see "
(page 333)
see "
7. Configure Downstream Parameters
(page 334)
see "
8. Configure Upstream Parameters
(page 335)
see "
9. Configure Fiber Node and Topology
(page 337)
see "
10. Configure a Dynamic Bonding Group
(page 337)
see "
(page 337)
see "
(page 338)
see "
(page 338)
see "
(page 339)
see "
(page 340)
see "
(page 340)
see "
(page 340)
see "
18. Configure/Verify Back Office Systems
(page 341)
see "
19. Verify the C4 CMTS Configuration
(page 341)
see "
(page 343)