5 - 9
CHAS
FRONT WHEEL AND REAR WHEEL
8. Install:
●
Right drive chain puller
1
●
Washer
2
●
Nut (wheel axle)
3
NOTE:
Temporarily tighten the nut (wheel axle) at this
point.
9. Adjust:
●
Drive chain slack
a
Refer to “DRIVE CHAIN SLACK
ADJUSTMENT” section in the CHAP-
TER 3.
Drive chain slack:
40 ~ 50 mm (1.6 ~ 2.0 in)
10. Tighten:
●
Nut (wheel axle)
1
●
Locknut
2
T
R
.
.
125 Nm (12.5 m · kg, 90 ft · lb)
Содержание YZ250F(P)/LC
Страница 312: ...4 28 ENG 7 Install Oil tank breather hose Cylinder head breather hose Spark plug T R 13 Nm 1 3 m kg 9 4 ft lb CAMSHAFTS...
Страница 664: ......
Страница 665: ......
Страница 666: ...PRINTED IN JAPAN 2001 8 1 7 1 CR E F G H PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...