
2 - 20
SPEC
1
Spark plug lead
2
Ignition coil
3
CDI unit
4
CDI unit band
5
Throttle cable (return)
6
Throttle cable (pull)
7
Cable guide
8
CDI unit lead
9
CDI unit stay
0
Radiator breather hose
A
Radiator hose 4
Å
Pass the CDI unit lead
between the radiator hose and
radiator mounting boss.
ı
Pass the throttle cables
through the cable guide.
Ç
Pass the throttle cables and
CDI unit lead through the cable
guide.
Î
Pass the throttle cables under
the radiator mounting boss.
‰
Insert the CDI unit band over
the CDI unit stay (frame) as far
as possible.
Ï
Pass the radiator breather
hose in front of the radiator
mounting rear boss and at the
left of the chassis. And then,
pass it between the radiator
hose 4 and down tube (frame)
and between the engine and
lower engine guard.
CABLE ROUTING DIAGRAM
Содержание YZ250F(P)/LC
Страница 312: ...4 28 ENG 7 Install Oil tank breather hose Cylinder head breather hose Spark plug T R 13 Nm 1 3 m kg 9 4 ft lb CAMSHAFTS...
Страница 664: ......
Страница 665: ......
Страница 666: ...PRINTED IN JAPAN 2001 8 1 7 1 CR E F G H PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...