2-28
Installing the Dektak 150 System
Figure 2-41: Environmental Enclosure
INSTALLING THE OPTIONAL VIBRATION ISOLATION
TABLE
The optional floor-mounted vibration isolation table or benchtop-mounted vibration isolation
platform significantly decreases vibration and enables more accurate profiling. The vibration
isolation system must be installed and ready for the Dektak 150 when the profiler arrives at your site.
Review the information in
Appendix A, Facilities Specifications,
and then refer to the manufacturer’s
instructions to install the platform or table.
INSTALLING THE OPTIONAL VIDEO MONITOR
You can supply your own monitor or purchase the optional 17-inch, high-resolution flat panel display
color monitor from Veeco. The monitor cable connects to the video port on the back of the monitor
and to the video board port on the computer. The power supply cable also connects to the back of the
monitor and into an appropriate power outlet through the power bar (and then preferably through a
surge protector).
Содержание Dektak 150
Страница 1: ......
Страница 2: ...P N 980 294 Standard P N 980 298 Cleanroom Revision A DEKTAK 150 SURFACE PROFILER USER S MANUAL ...
Страница 7: ......
Страница 17: ......
Страница 81: ......
Страница 105: ......
Страница 149: ......
Страница 191: ......
Страница 251: ......
Страница 257: ...A 6 Facilities Specifications Figure A 6 Dektak 150 without Enclosure Side View ...
Страница 258: ...Facilities Specifications A 7 Figure A 7 Dektak 150 Dimensions without Enclosure Top View ...
Страница 259: ...A 8 Facilities Specifications Figure A 8 Dektak 150 without Enclosure Center of Mass ...
Страница 273: ......
Страница 283: ......
Страница 320: ...3D Mapping Function E 37 Figure E 26 Database Options Button Figure E 27 Database Options Dialog Box ...
Страница 321: ......
Страница 331: ......
Страница 333: ......
Страница 336: ......
Страница 337: ......
Страница 349: ......