Installation Checklist
RT-SVX24J-EN
95
Energy Recovery Wheel
Verify that the wheel turns freely though a full rotation
Confirm that all wheel segments are fully engaged in
the wheel frame and that the segment retainers are
completely fastened
Confirm the seal adjustment and proper belt tracking on
the wheel rim