Warnings, Cautions and Notices
RT-SVX24J-EN
3
Note:
The procedures discussed in this manual should
only be performed by qualified and experienced
HVAC technicians.
Overview of Manual
This booklet describes proper installation, startup,
operation, and maintenance procedures for 90 to 162 ton
rooftop air conditioners designed for CV, RR, VAV, or SZ
VAV applications. By carefully reviewing the information
within this manual and following the instructions, the risk
of improper operation and/or component damage will be
minimized.
Note:
One copy of the appropriate service literature ships
inside the control panel of each unit.
It is important that periodic maintenance be performed to
help assure trouble free operation. Should equipment
failure occur, contact a qualified service organization with
qualified, experienced HVAC technicians to properly
diagnose and repair this equipment.
Note:
Do Not release refrigerant to the atmosphere!
If adding or removing refrigerant is required, the service
technician must comply with all federal, state, and local
laws.
Revision Summary
RT-SVX24J-EN (Aug 2013)
This version includes minor updates to the compressor
nameplate summary (see
p. 10
), electrical service sizing
(
Table 22, p. 79
) and installation checklist (see float and
thermostatic step (
“Steam Heat,” p. 94
).
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...