Installation Checklist
General Checklist (applies to all units)
Unit checked for shipping damage and material
shortage
Verify that the installation location of the unit will
provide the required clearance for proper operation
Roof curb assembled and installed
Roof curb level and square
Ductwork secured to curb, or unit
Corners of duct adapters sealed on units with horizontal
supply or return
Horizontal supply or return ductwork is self supporting
Pitch pocket installed for units with power supply
through building roof
Unit set on curb and checked level
Unit-to-curb seal checked to ensure it is tight and
without buckles or cracks
Condensate drain lines installed to each evaporator
drain connection
Verify that all access doors open 100% and are not
obstructed by drain lines etc.
Shipping hardware removed from each compressor
assembly
Shipping hold-down bolts and shipping channels
removed from the supply and exhaust/return fans with
spring isolators
Supply and exhaust/return fans spring isolators
checked for proper adjustment
Plastic coverings (paint shields) removed from all
compressors (if present)
Verify all discharge, suction, and liquid line service
valves are back seated
Compressor crankcase heaters energized for a
minimum of 12 hours prior to unit refrigeration system
startup
Verify that unit literature (IOM, PTG) are left inside
control box for startup
Unit Rigging and Placement (Two-Piece—
addition to General Checklist)
First, rig and set the low side unit on the roof curb
(aligned with return end)
Remove the rail connector splice brackets and install
the brackets on the low side unit base rails
Take off the side panels (these are labeled) and the top
cover of the high side unit and set aside to be assembled
later
Rig and set the high side unit on roof curb pedestal
Lift the unit and position it over the pedestal
Use the rail splice bracket as an alignment aid to
connect the Low and high side units. The Low and high
side unit rails should be butted together with a maximum
2" (preferably 1") separation
Remove the left upper and lower louvered panels of the
high side unit as well as the corner panels on each side to
aid in tubing and wiring connections
Close refrigeration shut off valves as indicated in this
manual—Liquid, discharge, hot gas bypass (if present),
and hot gas reheat (if present).
For Evaporative Condensers
Recover/transfer charge from tubing between shut
valves and stub point.
For 2 and 3 piece Air-Cooled condensers add field
charge per nameplate.
Braze refrigerant piping connections and leak test
Low side and high side evacuated to 500 microns
Standing vacuum does not rise over 200 microns in 15
minutes
Open service valves to allow refrigerant flow
Refrigerant released from discharge to suction until
suction pressure is approximately 60 PSIG
Power wires connected in connection box
Control wires connected in connection box
Seal air gaps around wiring and refrigerant tubing
through bulkhead
Side panels and top cover assembled between high and
low side
Verify line dampening weights are installed on each
discharge line.
Unit Rigging and Placement (Three-piece
unit) (in addition to Two-piece unit rigging
and placement)
Rail guide attached to evaporator section base rails
Evaporator section rigged and set onto roof curb,
aligned with supply end
Removed and discarded shipping protection panels
and top blockoffs from evaporator section
Removed side panels and roof cap from evaporator
section
Applied gasket and butyl tape as indicated in the IOM
Removed and discarded shipping protection panels
and top block off from outside air section
Rigged and set outside air section onto roof curb to
within 2" of evaporator section
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...