Table of Contents
RT-SVX24J-EN
5
unit) (in addition to Two-piece unit rigging
and placement) . . . . . . . . . . . . . . . . . . . . . 93
Unit Startup
. . . . . . . . . . . . . . . . . . . . . . . . . . . . 96
Sequence of Operation . . . . . . . . . . . . . . . . 96
Cooling Sequence of Operation . . . . . . . 96
Compressor Sequence of Operation . . . 96
Units with Evaporative Condenser Sequence
of Operation . . . . . . . . . . . . . . . . . . . . . . . 97
Modulating Dehumidification (Hot Gas
Reheat) Sequence of Operation . . . . . . 101
Energy Recovery Sequence of Operation 103
Gas Heating Sequence of Operation
Standard . . . . . . . . . . . . . . . . . . . . . . . . . 105
Honeywell Ignition System . . . . . . . . . . 105
Modulating Gas Sequence of Operation 106
Electric Heat Sequence of Operation . . 106
Electric Heat—CV, VAV Daytime Warm-up
107
VAV Active Occupied Discharge Heating 107
SZVAV Occupied Heating . . . . . . . . . . . 107
Demand Control Ventilation Sequence of
Operation . . . . . . . . . . . . . . . . . . . . . . . . 107
Return Fan Sequence of Operation . . . . 107
Wet Heat Sequence of Operation . . . . . 108
Unit Startup Check List . . . . . . . . . . . . . . . 108
Performance Data . . . . . . . . . . . . . . . . . . . 118
Supply Fan with or without Variable
Frequency Drive . . . . . . . . . . . . . . . . . . . 118
Airside Pressure Drop Standard Evaporator
Coil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120
Exhaust Fan Performance . . . . . . . . . . . 122
Return Fan Performance . . . . . . . . . . . . 123
Component Static Pressure Drops . . . . 125
Pressure Curves . . . . . . . . . . . . . . . . . . . . . 134
Components . . . . . . . . . . . . . . . . . . . . . . . . 143
Standard Unit without Energy Recovery
Wheel . . . . . . . . . . . . . . . . . . . . . . . . . . . 143
Standard Unit with Energy Recovery
Wheel . . . . . . . . . . . . . . . . . . . . . . . . . . . 146
Energy Recovery Wheel (ERW) . . . . . . . 151
Service and Repair . . . . . . . . . . . . . . . . . 156
Seal Adjustment . . . . . . . . . . . . . . . . . . . 158
Compressor Startup . . . . . . . . . . . . . . . . .159
Compressor Operational Sounds . . . . . .160
Evaporative Condenser Startup . . . . . . .161
Thermostatic Expansion Valves . . . . . . .163
Measuring Superheat . . . . . . . . . . . . . . .163
Charging by Subcooling . . . . . . . . . . . . .163
Standard Ambient Units . . . . . . . . . . . . .163
Electric, Steam and Hot Water Startup . .164
Gas Furnace Startup . . . . . . . . . . . . . . . .164
Two Stage Gas Furnace . . . . . . . . . . . . . .165
Full Modulating Gas Furnace . . . . . . . . .167
Final Unit Checkout . . . . . . . . . . . . . . . . .169
Service and Maintenance
. . . . . . . . . . . . . . .173
Scroll Compressor Replacement . . . . . .181
VFD Programming Parameters . . . . . . . .182
Monthly Maintenance . . . . . . . . . . . . . . .183
Filters . . . . . . . . . . . . . . . . . . . . . . . . . . . . .183
Air-Cooled Coil Cleaning . . . . . . . . . . . . .185
Evaporative Condenser Coil Cleaning . .186
Final Process . . . . . . . . . . . . . . . . . . . . . . .188
Unit Wiring Diagram Number
. . . . . . . . . . . .190
Warranty and Liability Clause
. . . . . . . . . . . .196
Index
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .197
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...