Installation
72
RT-SVX24J-EN
General Coil Piping and Connection
Recommendations
Proper installation, piping, and trapping is necessary to
ensure satisfactory coil operation and to prevent
operational damage:
•
Support all piping independently of the coils.
•
Provide swing joints or flexible fittings on all
connections that are adjacent to heating coils to
absorb thermal expansion and contraction strains.
•
Install factory supplied control valves (valves ship
separately).
Note:
The contractor is responsible for supplying the
installation hardware.
•
When attaching the piping to the coil header, make the
connection only tight enough to prevent leaks.
Maximum recommended torque is 200 foot-pounds.
•
Use pipe sealer on all thread connections.
Table 19. Gas heat piping penetration measurements
Tons
Energy
Recovery
Wheel
(ERW)
Pieces
Heat
(MBH)
Gas Flue
Condensate Drain
Outlet
Gas Connection,
Horizontal
Gas Connection,
Base
Horizontal Distance
Mist Elim
to Flue C/L
Unit End
to Hole C/L
Unit End
to Hole C/L
K
C
H
B
90-118
No ERW
1 & 2 Pc
1800
160 1/16
254 14/16
266 4/16
274 11/16
90-118
No ERW
1 & 2 Pc
1100
159 15/16
263 15/16
265 5/16
274 11/16
90-118
No ERW
1 & 2 Pc
850
159 15/16
263 15/16
265 5/16
274 11/16
120-162
No ERW
1 & 2 Pc
2500
214 11/16
321
337 7/16
339 7/16
120-162
No ERW
1 & 2 Pc
1800
214 13/16
319 11/16
331
339 7/16
120-162
No ERW
1 & 2 Pc
1100
214 11/16
327 14/16
330 1/16
339 7/16
90-118
ERW
1 & 2 Pc
1800
164 11/16
351 5/16
362 10/16
371 1/16
90-118
ERW
1 & 2 Pc
1100
164 8/16
360 6/16
361 12/16
371 1/16
90-118
ERW
1 & 2 Pc
850
164 8/16
360 6/16
361 12/16
371 1/16
120-162
ERW
1 & 2 Pc
2500
219 13/16
417 7/16
433 14/16
435 14/16
120-162
ERW
1 & 2 Pc
1800
220
416 2/16
427 7/16
435 14/16
120-162
ERW
1 & 2 Pc
1100
219 13/16
424 5/16
426 8/16
435 14/16
90-118
No ERW
3 Pc
1800
179 6/16
274 3/16
285 8/16
293 15/16
90-118
No ERW
3 Pc
1100
179 3/16
283 3/16
284 9/16
293 15/16
90-118
No ERW
3 Pc
850
179 3/16
283 3/16
284 9/16
293 15/16
120-162
No ERW
3 Pc
2500
240 2/16
346 8/16
362 15/16
364 15/16
120-162
No ERW
3 Pc
1800
240 5/16
345 3/16
356 8/16
364 15/16
120-162
No ERW
3 Pc
1100
240 2/16
353 6/16
355 9/16
364 15/16
90-118
ERW
3 Pc
1800
183 15/16
376 13/16
388 2/16
390 6/16
90-118
ERW
3 Pc
1100
183 13/16
385 13/16
387 3/16
390 6/16
90-118
ERW
3 Pc
850
183 13/16
385 13/16
387 3/16
390 6/16
120-162
ERW
3 Pc
2500
245 5/16
442 15/16
459 6/16
461 6/16
120-162
ERW
3 Pc
1800
245 8/16
441 9/16
452 15/16
461 6/16
120-162
ERW
3 Pc
1100
245 5/16
449 12/16
452
461 6/16
CAUTION
Connection Leaks!
Use a backup wrench when attaching piping to coils
with copper headers to prevent damage to the coil
header. Do not use brass connectors because they
distort easily and could cause connection leaks.
CAUTION
Over Tightening!
Do not use teflon-based products for any field
connections because their high lubricity could allow
connections to be over-tightened, resulting in damage
to the coil header.
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...