Scroll Compressor Replacement
The compressor manifold system was purposely designed
to provide proper oil return to each compressors. The
refrigerant manifold system must not be modified in any
way.
Note:
Altering the compressor manifold piping may
cause oil return problems and compressor failure.
Should a compressor replacement become necessary and
a suction line filter drier is to be installed, install it a
minimum of 18 inches upstream of the oil separator tee.
See
Figure 123, p. 181
.
Anytime a compressor is replaced, the oil for each
compressor within the manifolded set must be replaced.
The scroll compressor uses Trane OIL00079 (one quart
container) or OIL00080 (one gallon container) without
substitution.The appropriate oil charge for CSHN250 and
CSHN315 scroll compressors is 14.2 pints. For CSHN374
scroll compressor, use 15.2 pints.
The recommended method for evacuation and
dehydration is to evacuate both the high side and the low
side to 500 microns or less. To establish that the unit is
leak-free, use a standing vacuum test. The maximum
allowable rise over a 15 minute period is 200 microns. If
the rise exceeds this, there is either still moisture in the
system or a leak is present.
Note:
Do Not release refrigerant to the atmosphere! If
adding or removing refrigerant is required, the
service technician must comply with all Federal,
State and local laws.
Table 59. Belt Tension Measurement and Deflection Ranges
Belt
Cross
Section
Smallest
Sheave
Diameter
Range (In.)
RPM Range
Belt Deflection Force (Lbs.)
Super Gripbelts and
Unnotched Gripbands
Gripnotch Belts and
Notched Gripbands
Min.
Max.
Min.
Max.
A, AX
3.0-3.6
1000-2500
3.7
5.5
4.1
6.1
3.8-4.8
1000-2500
4.5
6.8
5.0
7.4
5.0-7.0
1000-2500
5.4
8.0
5.7
8.4
B, BX
3.4 – 4.2
860-2500
--
--
4.9
7.2
4.4 – 5.6
860-2500
5.3
7.9
7.1
10.5
5.8 – 8.6
860-2500
6.3
9.4
8.5
12.6
3V, 3VX
2.2 - 2.4
1000-2500
--
--
3.3
4.9
2.65 - 3.65
1000-2500
3.6
5.1
4.2
6.2
4.12 - 6.90
1000-2500
4.9
7.3
5.3
7.9
5V, 5VX
4.4 – 6.7
500-1749
1750-3000
--
--
10.2
8.8
15.2
13.2
7.1 –10.9
500-1740
12.7
18.9
14.8
22.1
11.8-16.0
500-1740
15.5
23.4
17.1
25.5
Figure 123.Suction Line Filter/Drier Installation
Sight glass
Suction service
valve
Replaceable core
drier
Note: These components are also located at circuit #1 side
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...