Unit Startup
170
RT-SVX24J-EN
startup and proper system subcooling and superheat will
be verified.
The unit fans will be checked to ensure that the condenser
fan blade set-screws to the motor shaft are tight, that the
hold down bolts and channels from fan sections have been
removed, proper adjustment of fan section spring
isolators, proper fan belts tension, adequate fan bearings
grease, alignment of fan sheaves, adequate tightness of
supply and exhaust fan pulley bolts, proper fan rotation,
and proper fan motor amperage.
A check will be made to ensure both piping to the
condenser and air handler side of the system have been
completed and interconnecting refrigerant tubing has
been evacuated by the contractor prior to Trane
performing the startup. All damper linkages will be
checked for proper adjustment, and proper damper
operation and outside air pressure sensors verified.
Units equipped with electric heaters will be checked to
ensure that the heating system matches the unit
nameplate and for correct voltage supply to the heaters.
Units equipped with gas heaters will be checked to ensure
that the flue assembly is secure and properly installed,
sufficient gas pressure exists according to pipe size, no
leaks exist in gas supply line, the gas heat piping includes
a drip leg, condensate line and the combustion air CO2 and
O2 levels are normal.
Units equipped with hot water heat will be checked to
ensure that the hot water pipes are properly routed, sized
and leak free; for the presence of swing joints or flexible
connectors next to the hot water coil; proper gate valve
installation in the supply and return branch line; proper
three way modulating valve installation, and proper coil
venting will be verified.
Units equipped with steam heat will be checked to ensure
that the hot water pipes are properly routed, sized and leak
free; proper swing check vacuum breaker installation;
proper 2-way modulating valve installation; proper steam
trap installation.
Units equipped with energy recovery wheels will be
checked to ensure proper rotation and operation of the
wheel.The service test guide will be used to check proper
component operation.
Finally, the program set points for proper unit operation
will be validated through human interface module. Once
the IntelliPak II multi-piece unit has been started, a
communication will be provided of startup activities and
the associated operating log.
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...