Installation
RT-SVX24J-EN
85
–
Heat - All heat stages off; Mod Heat output at 0 VDC
–
Occupied/Unoccupied/VAV box output - Energized
– VOM Relay - Energized
–
Preheat Output - Off
–
Return Fan - On; Exhaust Dampers - Open (if so
equipped)
–
Return VFD - Max (if so equipped)
–
OA Bypass Dampers - Open (if so equipped)
–
Exhaust Bypass Dampers - Open (if so equipped)
5. PURGE with duct pressure control sequence “E”
This sequence can be used when supply air control is
required for smoke control.
–
Supply Fan - On
–
Supply Fan VFD - (If so equipped) Controlled by
Supply Air Pressure Control function; Supply Air
Pressure High Limit disabled
–
Exhaust Fan - On; Exhaust Dampers Open (if so
equipped)
–
OA Dampers - Open; Return Damper - Closed
–
Heat - All heat stages off; Mod Heat output at 0 VDC
–
Occupied/Unoccupied/VAV box output - Energized
– VOM Relay - Energized
–
Preheat Output - Off
–
Return Fan - On; Exhaust Dampers - Open (if so
equipped)
–
Return VFD - Max (if so equipped)
–
OA Bypass Dampers - Open (if so equipped)
Exhaust Bypass Dampers - Open (if so equipped)
Temperature vs. Resistance Coefficient
The UCM network relies on various sensors located
throughout the system to provide temperature
information in the form of an analog input. All of the
sensors used have the same temperature vs. resistance
co-efficient and are made from Keystone Carbon D97
material with a 1 degree Centigrade tolerance.
Emergency Stop Input
A normally closed (N.C.) switch wired to the RTM may be
used during emergency situations to shut down all unit
operations. When opened, an immediate shutdown
occurs. An emergency stop diagnostic is entered into the
Human Interface and the unit must be manually reset.
Refer to the appropriate illustrations in
Figure 57, p. 87
Figure 59, p. 89
for the proper connection terminals in the
unit control panel. The switch must be rated for 12 ma @
24 VDC minimum.
External Stop Input
A normally closed (N.C.) switch wired to the RTM may be
used during emergency situations to shut down all unit
operations. When opened, an immediate shutdown
occurs. When the contacts are closed, the unit will resume
normal operation after minimum delays have occurred.
Refer to the appropriate illustrations in
Figure 57, p. 87
for
the proper connection terminals in the unit control panel.
Occupied/Unoccupied Contacts
To provide Night Setback control if a remote panel
with
NSB
was not ordered, a field supplied contact must be
installed. This binary input provides the Occupied/
Unoccupied status information of the building to the RTM.
It can be initiated by a time clock, or a Building Automation
System control output.The relay’s contacts must be rated
for 12 ma @ 24 VDC minimum. Refer to the appropriate
illustrations in
Figure 58, p. 88 Figure 59, p. 89
for the
proper connection terminals in the unit control panel.
Demand Limit Relay
If the unit is equipped with a Generic BAS Module, a
normally open (N.O.) switch may be used to limit the
electrical power usage during peak periods. When
demand limit is initiated, the mechanical cooling and
Table 34. Temp vs. resistance
Temp (F)
Resistance (in.
1000 Ohms)
Temp (F)
Resistance (in.
1000 Ohms)
-40
346.10
71
11.60
-30
241.70
72
11.31
-20
170.10
73
11.03
-10
121.40
74
10.76
-5
103.00
75
10.50
0
87.56
76
10.25
5
74.65
77
10.00
10
63.80
78
9.76
15
54.66
79
9.53
20
46.94
80
9.30
25
40.40
85
8.25
30
34.85
90
7.33
35
30.18
100
5.82
40
26.22
105
5.21
45
22.85
110
4.66
50
19.96
120
3.76
55
17.47
130
3.05
60
15.33
140
2.50
65
13.49
150
2.05
66
13.15
160
1.69
67
12.82
170
1.40
68
12.5
180
1.17
69
12.19
190
0.98
70
11.89
200
0.83
Table 34. Temp vs. resistance (continued)
Temp (F)
Resistance (in.
1000 Ohms)
Temp (F)
Resistance (in.
1000 Ohms)
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...