15. Apply gasket to side panels removed earlier. Attach
side panel to unit split.
16. Apply 1.25" butyl tape on top of unit split along the roof
seam.
17. Attach roof cap over roof seam and butyl tape with
screws
Figure 25. Rail guide locations
Attach rail guides
as shown
Figure 26. Evaporator section shipping protection
removal
Discard shipping
protection
Figure 27. Evaporator section side panel and roof cap removal
Save side panels
and roof cap for
reassembly
Discard shipping
protection
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...