Unit Startup
112
RT-SVX24J-EN
Table 38. Service test guide for component operation — part II of II
Component
Being Tested
Component Configuration
Occ
Unocc
Relay
Sump Pump
Sump Heater
Econo
Damper
Exhaust
Damper
VFD
Output
COMPRESSOR
90 - 105 Ton
1A
Closed
Closed
0%
Default
OFF
OFF
1B
Closed
Closed
0%
Default
OFF
OFF
2A
Closed
Closed
0%
Default
OFF
OFF
2B
Closed
Closed
0%
Default
OFF
OFF
120 - 162 Ton
1A
Closed
Closed
0%
Default
OFF
OFF
1B
Closed
Closed
0%
Default
OFF
OFF
2A
Closed
Closed
0%
Default
OFF
OFF
2B
Closed
Closed
0%
Default
OFF
OFF
CONDENSER FANS
90 - 105 Ton — Air Cooled
1A
Closed
Closed
0%
Default
OFF
OFF
1B & 1C
Closed
Closed
0%
Default
OFF
OFF
2A
Closed
Closed
0%
Default
OFF
OFF
2B & 2C
Closed
Closed
0%
Default
OFF
OFF
120 - 150 Ton — Air Cooled
1A
Closed
Closed
0%
Default
OFF
OFF
1B
Closed
Closed
0%
Default
OFF
OFF
1C & 1D
Closed
Closed
0%
Default
OFF
OFF
2A
Closed
Closed
0%
Default
OFF
OFF
2B & 2C
Closed
Closed
0%
Default
OFF
OFF
2D
Closed
Closed
0%
Default
OFF
OFF
100, 118, 128, 140, 162 Ton — Evaporative Cooled
1A
Closed
Closed
0%
Default
OFF
OFF
2A
Closed
Closed
0%
Default
OFF
OFF
SUPPLY FAN
Closed
Closed
100%
Unocc
OFF
OFF
RETURN FAN
Closed
Closed
100%
Default
OFF
OFF
EXHAUST FAN
Closed
Closed
100%
Default
OFF
OFF
GAS HEAT
(Full Capacity)
Closed
Closed
100%
Unocc
OFF
OFF
Stage 1
Closed
Closed
100%
Unocc
OFF
OFF
Stage 2
Closed
Closed
100%
Unocc
OFF
OFF
Full Modulating
Closed
Closed
100%
Unocc
OFF
OFF
ELECTRIC HEAT
Closed
Closed
100%
Unocc
OFF
OFF
Stage 1
Closed
Closed
100%
Unocc
OFF
OFF
Stage 2
Closed
Closed
100%
Unocc
OFF
OFF
Stage 3
Closed
Closed
100%
Unocc
OFF
OFF
HYDRONIC HEAT
Closed
Closed
100%
Default
OFF
OFF
OUTSIDE AIR
DAMPERS
Closed
Closed
100%
Default
OFF
OFF
EXHAUST DAMPERS
Closed
Closed
100%
Default
OFF
OFF
EVAP COND
Sump Pump
Closed
Closed
100%
Default
ON
OFF
Sump Heater
Closed
Closed
100%
Default
OFF
ON
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...