Unit Startup
RT-SVX24J-EN
169
Final Unit Checkout
After completing all of the checkout and startup
procedures outlined in the previous sections (i.e.,
operating the unit in each of its Modes through all
available stages of cooling and heating), perform these
final checks before leaving the unit:
[ ] Close the disconnect switch or circuit protector
switch that provides the supply power to the unit
terminal block or the unit mounted disconnect switch.
HIGH VOLTAGE IS PRESENT AT TERMINAL BLOCK OR
UNIT DISCONNECT SWITCH.
[ ] Turn the 115 volt control circuit switch “Off”.
[ ] Turn the 24 volt control circuit switch to the “On”
position.
[ ] At the Human Interface Module, press the “SETUP”
key. The LCD screen will display various preset
“parameters of operation” based on the unit type, size,
and the installed options. Compare the factory preset
information to the specified application requirements.
If adjustments are required, follow the step-by-step
instructions provided in the appropriate programming
manual for CV or VAV applications.
[ ] Program the Night Setback (NSB) panel (if
applicable) for proper unoccupied operation. Refer to
the programming instructions for the specific panel.
[ ] Verify that the Remote panel “System” selection
switch, “Fan” selection switch, and “Zone
Temperature” settings for constant volume systems
are correct.
[ ] Verify that the Remote panel “System” selection
switch and the “Supply Air Temperature” settings for
variable air volume systems are correct.
[ ] Inspect the unit for misplaced tools, hardware, and
debris.
[ ] Turn the 115 volt control circuit switch “On”.
[ ] Press the “AUTO” key at the Human Interface
Module to begin system operation. The system will
start automatically once the dampers modulate and a
request for either heating or cooling has been given.
[ ] Verify that all exterior panels including the control
panel doors and condenser grilles are secured in place.
Multi-piece Unit—Trane Startup
Once the IntelliPak II multi-piece unit has been installed, all
shipped with items have been installed, all utilities and
drain pipes have been connected, the refrigeration piping
has been reconnected and refrigerant charge has been
adequately distributed throughout the system, and all
ductwork has been attached to the unit,Trane will provide
unit startup.
Trane startup of multi-piece units will review the overall
unit for exterior damage (dents, bends, missing panels,
doors work properly), verify that the unit interior is free
from debris/obstructions, ensure that the panels and
doors are secured properly and verify that all wiring
connections are tight.
The overall installation will be reviewed to ensure the unit
clearances are adequate to avoid air recirculation and all
unit drain lines and traps are properly installed.
The unit main power will be reviewed to ensure the unit is
properly grounded, the main power feed wire gauge is
adequately sized, the correct voltage is supplied to unit
and electric heaters, and the incoming voltage is phase
balanced. Verification will be performed to ensure that all
field installed control wiring is applied to the correct
terminals, all automation and remote controls installed/
wired and control wiring for CV, SZVAV and VAV controls
is completed.
The refrigeration system will be reviewed to ensure the
coil fins are straightened, the removal of shipping
hardware and plastic covers for compressors, proper oil
level in the compressors, crankcase heaters have been
operational for at least 12 hours time prior toTrane startup
being performed. The proper compressor voltage and
amperage, correct position of service valves prior to
Figure 120. 850-1100 MBH
WARNING
Hazardous Voltage!
Disconnect all electric power, including remote
disconnects before servicing. Follow proper lockout/
tagout procedures to ensure the power can not be
inadvertently energized. Failure to disconnect power
before servicing could result in death or serious injury.
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...