Unit Startup
RT-SVX24J-EN
155
Inner Segment Removal Procedure:
1.
Disconnect all electrical power.
2. Secure wheel from rotation.
3. Support segment with one hand while removing ¼ - 20
flat head retaining screw in the wheel hub with 5/32"
Allen wrench, see
Figure 108
.
4. Carefully slide the segment out from between the hub
plates, and remove from the wheel.
5. Reinsert the ¼ - 20 screw in the removed segment nose
to avoid loss.
6. Rotate the wheel and continue this procedure to
remove all segments.
Segment Replacement
Inner Segment Replacement
1.
Disconnect all electrical power.
2. Secure wheel from rotation.
3. Remove ¼ - 20 flat head retaining screw from the inner
segment nose with 5/32" Allen wrench.
4. Rest the edge of the segment on the support flange on
one wheel spoke and slide it until the segment nose is
fitted firmly in the wheel hub and the segment screw
hole is aligned with the hub slot.
5. Reinsert ¼ - 20 screw into the hub / inner segment and
tighten until the screw is firmly seated, see
Figure 108
.
CAUTION
Sharp Edges!
The service procedure described in this document
involves working around sharp edges. To avoid being
cut, technicians MUST put on all necessary Personal
Protective Equipment (PPE), including gloves and arm
guards. Protect hands and the belt from possible sharp
edges of the hole in the bearing support beam. Failure
to follow recommendations could result in minor to
moderate injury or product damage.
CAUTION
Added Support Required!
Before laying across the energy wheel, place a rigid
board across the span of the energy wheel cassette.
Failure to do so could result in personal injury and/or
damage to the energy wheel.
Figure 108. Inner Segment Removal
WARNING
Hazardous Voltage!
Disconnect all electric power, including remote
disconnects before servicing. Follow proper lockout/
tagout procedures to ensure the power can not be
inadvertently energized. Do not open the service access
doors while the unit is operating. Failure to disconnect
power before servicing could result in death or serious
injury.
CAUTION
Sharp Edges!
The service procedure described in this document
involves working around sharp edges. To avoid being
cut, technicians MUST put on all necessary Personal
Protective Equipment (PPE), including gloves and arm
guards. Protect hands and the belt from possible sharp
edges of the hole in the bearing support beam. Failure
to follow recommendations could result in minor to
moderate injury or product damage.
CAUTION
Added Support Required!
Before laying across the energy wheel, place a rigid
board across the span of the energy wheel cassette.
Failure to do so could result in personal injury and/or
damage to the energy wheel.
Содержание SEHJ090-162
Страница 40: ...Dimensional Data 40 RT SVX24J EN Figure 13 Evaporative condenser water connection locations RIGHT SIDE VIEW ...
Страница 48: ...Installation 48 RT SVX24J EN Figure 18 Ductwork conversion ...
Страница 58: ...Installation 58 RT SVX24J EN Figure 36 5 Connected tubes 6 install panels Connected tubes 5 6 ...
Страница 75: ...Installation RT SVX24J EN 75 Figure 51 Hot water coil piping Figure 52 Steam coil piping ...
Страница 87: ...Installation RT SVX24J EN 87 Figure 57 Typical field wiring diagram for 90 to 162 ton CV control options ...
Страница 89: ...Installation RT SVX24J EN 89 Figure 59 Typical field wiring diagram for 90 to 162 ton VAV control options ...